Modeling of period overlapping setup times
Tài liệu tham khảo
Blocher, 1999, The changeover scheduling problem with time and cost considerations: Analytical results and a forward algorithm, Operations Research, 47, 559, 10.1287/opre.47.4.559
Cattrysse, 1993, A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times, Management Science, 39, 477, 10.1287/mnsc.39.4.477
Dash Optimization, 2002. Xpress Optimizer Reference Manual, Blisworth, UK.
Drexl, 1995, Proportional lotsizing and scheduling, International Journal of Production Economics, 40, 73, 10.1016/0925-5273(95)00040-U
Fleischmann, 1990, The discrete lot-sizing and scheduling problem, European Journal of Operational Research, 44, 337, 10.1016/0377-2217(90)90245-7
Haase, 1994
Hindi, 2003, An effective heuristic for the CLSP with set-up times, Journal of the Operational Research Society, 54, 490, 10.1057/palgrave.jors.2601525
Kuik, 1994, Batching decisions: Structure and models, European Journal of Operational Research, 75, 243, 10.1016/0377-2217(94)90072-8
Leschke, 1995, Plastech, Inc.—the importance of matching production capabilities and market requirements, Production and Inventory Management Journal, 36, 11
Porkka, 2003, Multiperiod production planning carrying over set-up time, International Journal of Production Research, 41, 1133, 10.1080/0020754021000042995
Suerie, 2003, The capacitated lot-sizing problem with linked lot-sizes, Management Science, 49, 1039, 10.1287/mnsc.49.8.1039.16406
Trovinger, S.C., Bohn, R.E., 2003. Setup time reduction for electronics assembly: Combining simple (SMED) and sophisticated methods. Report 1997-03, The Information Storage Industry Center, University of California, San Diego.
Wolsey, 1998
Zangwill, 1987, From EOQ towards ZI, Management Science, 33, 1209, 10.1287/mnsc.33.10.1209