Acharya, N.K., Lee, Y.D., and Im, H.M. (2006). “Investigating delay factors in construction industry: A Korean perspective.” Korean Journal of Construction Engineering and Management, Vol. 10, pp. 177–190.
Aibinu, A.A. and Odeyinka, A. (2006). “Construction delays and their causative factors in Nigeria.” J. Constr. Eng. Management, ASCE, Vol. 132, No. 7, pp. 667–677.
Assaf, S.A. and Al Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Project Management, Vol. 24, pp. 349–357.
Berstein, S. and Bernstein, R. (1999). Elements of statistics, Schaum’s Outlines Series, Mc Graw-Hill.
Chan, D.W.M. and Kumaraswamy, M.M. (1996), “An evaluation of construction time performance in the building industry.” Building and Environment, Vol. 31, No. 6, pp. 569–578.
Chang A. Shing-Tao (2002). “Reasons for cost and schedule increase for engineering design projects.” J. Management Eng., ASCE, Vol. 18, No. 1, pp. 29–36.
Dissanayaka, S.M. and Kumaraswamy, M.M. (1999). “Comparing contributors to time and cost performance in building projects.” Building and Environment, Vol. 34, pp. 31–42.
Faridi, A.S. and El-Sayegh, S.M. (2006). “Significant factors causing delay in the UAE construction industry.” Construction Management and Economics, Vol. 24, No. 11, pp. 1167–1176.
Frimpong, Y., Oluwoye, J., and Crawford, L. (2003). “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study.” Int. J. Project Management, Vol. 21, pp. 321–326.
Vietnam General Statistics Office1 (GSO1). Report of Gross domestic product (Vietnamese), retrieved at: http://www.gso.gov.vn/default.aspx?tabid=388&idmid=3&ItemID=4751
Vietnam General Statistics Office2 (GSO2). Report of Capital investment of Vietnamese industries (Vietnamese), retrieved at: http://www.gso.gov.vn/default.aspx?tabid=392&idmid=3&ItemID=6218
Institute for Economic Research (IER)-Hochiminh City (2003). Results of economic integration and WTO participation preparation-report of HCM City vice chairman Nhan N.T. (Vietnamese) retrieved at: http://www.vienkinhte.hochiminhcity.gov.vn/xemtin.asp?idcha=1862&cap=4&id=1865
Kaming, P.F., Olomolaiye, P.O., Holt, G.D., and Harris, F.C. (1997). “Factors influencing construction time and cost overruns on highrise projects in Indonesia.” Construction Management and Economics, Vol. 15, No. 1, pp. 83–94.
Koushki, P.A., Al-Rashid, K., and Kartam, N. (2005). “Delays and cost increases in the construction of private residential projects in Kuwait.” Construction Management and Economics, Vol. 23, No. 3, pp. 285–294.
Kumaraswamy, M.M. and Chan, D.W.M. (1998). “Contributors to construction delays.” Construction Management and Economics, Vol. 16, No. 1, pp 17–29.
Lo, T.Y., Fung, I.W.H., and Tung, K.C.F. (2006). “Construction delays in Hong Kong civil engineering projects.” J. Constr. Eng. Management, ASCE, Vol. 132, No. 6, pp. 636–649.
Long, N.D., Ogunlana, S.O., and Lan, D.T.X. (2004a). “A study on project success factors in large construction projects in Vietnam.” Journal of Engineering, Construction and Architectural, Vol. 11, No. 6, pp. 404–413.
Long, N.D., Ogunlana, S., Quang, T., and Lam, K.C. (2004b). “Large construction projects in developing countries: a case study Vietnam.” Int. J. Project Management, Vol. 22, pp. 553–561.
Mansfield, N.R., Ugwu, O.O., and Doran, T. (1994). “Causes of delay and cost overruns in Nigeria construction projects.” Int. J. Project Management, Vol. 12, No. 4, pp. 254–260.
Ministry of Planning and Investment (2003). Report of supervision and assessment works in 2003, Number:799/BKH-ĐT&GSĐT (Vietnamese).
Odeh, A.M. and Battaineh, H.T. (2002). “Causes of construction delay: Traditional contracts.” Int. J. Project Management, Vol. 20, pp. 67–73.
Ogunlana, S.O, Promkuntong, K., and Jearkjirm, V. (1996). “Construction delays in a fast-growing economy: comparing Thailand with other countries.” Int. J. Project Management, Vol. 14, No. 1, pp. 37–45.
Sambasivan, M. and Soon, Y.W. (2007). “Causes and effects of delays in Malaysian construction industry.” Int. J. Project Management, Vol. 25, pp. 517–526.
Sekaran, U. (2003). Research methods for business, A Skill Building Approach, 4th Ed., John Wiley & Sons Inc.
Sweis, G., Sweis, R., Hammad, A.A., and Shboul, A. (2007). “Delays in construction projects: The case of Jordan.” Int. J. Project Management, Article in Press.