Shortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reduction

European Journal of Operational Research - Tập 228 - Trang 526-535 - 2013
Moustapha Diaby1, Jose M. Cruz1, Aaron L. Nsakanda2
1Department of Operations and Information Management, School of Business, University of Connecticut, Storrs, CT, 06269-2041, USA
2Sprott School of Business, Carleton University, 1125 Colonel By Drive, Ottawa, Ontario, Canada, K1S 5B6

Tài liệu tham khảo

Abdul-Kader, 2010, An integrated model for optimisation of production and quality costs, International Journal of Production Research, 48, 7357, 10.1080/00207540903382881 Affisco, 2002, Quality improvement and setup reduction in the joint economic lot size model, European Journal of Operational Research, 142, 497, 10.1016/S0377-2217(01)00308-3 Annadurai, 2010, Controlling setup cost in (Q, r, L) inventory model with defective items, Applied Mathematical Modelling, 34, 1418, 10.1016/j.apm.2009.04.010 Banerjee, 1996, Investment policy for multiple product setup reduction under budgetary and capacity constraints, International Journal of Production Economics, 45, 321, 10.1016/0925-5273(95)00122-0 Bazaraa, 1979 Boyd, 2007, A tutorial on geometric programming, Optimization and Engineering, 8, 67, 10.1007/s11081-007-9001-7 Buzacott, 1986, Flexible manufacturing systems: a review of analytical models, Management Science, 32, 890, 10.1287/mnsc.32.7.890 Byrne, 1995, Wiremold reinvented itself with Kaizen, Target, 11 Chen, 2003, An optimal design for process quality improvement: modelling and application, Production Planning & Control, 14, 603, 10.1080/09537280310001626197 Diaby, 1995, Optimal setup time reduction for a single product with dynamic demands, European Journal of Operational Research, 85, 532, 10.1016/0377-2217(94)00030-G Diaby, 2000, Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments, International Journal of Production Economics, 67, 219, 10.1016/S0925-5273(00)00021-9 Ecker, 1980, Geometric programming: methods, computations and applications, SIAM Review, 22, 338, 10.1137/1022058 Elmaghraby, 1978, The economic lot scheduling problem (ELSP): review and extensions, Management Science, 24, 587, 10.1287/mnsc.24.6.587 Etienne-Hamilton, 1994 Freimer, 2006, The value of setup cost reduction and process improvement for the economic production quantity model with defects, European Journal of Operational Research, 173, 241, 10.1016/j.ejor.2004.11.024 Gong, 1997, A markovian model for process setup and improvement, Naval Research Logistics, 44, 383, 10.1002/(SICI)1520-6750(199706)44:4<383::AID-NAV7>3.0.CO;2-2 Gupta, 2005, The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times, Computers & Operations Research, 32, 727, 10.1016/j.cor.2003.08.014 Hong, 1993, Process quality improvement and setup reduction in dynamic lot-sizing, International Journal of Production Research, 31, 2693, 10.1080/00207549308956891 Hong, 1995, Joint investment in quality improvement and setup reduction, Computers and Operations Research, 2, 567, 10.1016/0305-0548(94)00054-C Hwang, 1993, Multiproduct economic lot size with investment costs for setup reduction and quality improvement, International Journal of Production Research, 31, 691, 10.1080/00207549308956751 Johansen, 1986, Lesson in SMED with Shigeo Shingo, Industrial Engineering, 18, 26 Kim, S.L., 1990. Setup Cost Reduction Models and Synergistic Effects. Ph.D. Dissertation, Pennsylvania State University. Kim, 1995, Setup reduction and machine availability, Production and Operations Management, 4, 76, 10.1111/j.1937-5956.1995.tb00042.x Kulkarni, 2004, Process investment and loss functions: models and analysis, European Journal of Operational Research, 157, 120, 10.1016/S0377-2217(03)00147-4 Kulkarni, 2008, Loss-based quality costs and inventory planning: general models and insights, European Journal of Operational Research, 188, 428, 10.1016/j.ejor.2007.04.041 Kulkarni, 2008, On a multi-product model of lot-sizing with quality costs, International Journal of Production Economics, 112, 1002, 10.1016/j.ijpe.2007.11.006 Leschke, 1997, A comparison of rules for allocating set-up reduction investments in a capacitated environment, Production and Operations Management, 6, 329, 10.1111/j.1937-5956.1997.tb00477.x Leung, 2007, A generalized geometric programming solution to an economic production quantity model with flexibility and reliability considerations, European Journal of Operational Research, 176, 240, 10.1016/j.ejor.2005.06.049 Li, 1997, Investment in setup cost, lead time, and demand predictability improvement in the EOQ model, Production and Operations Management, 6, 341, 10.1111/j.1937-5956.1997.tb00478.x Li, 2008, Inventory and investment in setup and quality operations under return on investment maximization, European Journal of Operational Research, 185, 593, 10.1016/j.ejor.2006.11.045 Liu, 2007, A note on quality improvement and setup reduction in the joint economic lot size model, European Journal of Operational Research, 182, 194, 10.1016/j.ejor.2006.07.014 Löfberg, J., 2004. Yalmip: A Toolbox for Modeling and Optimization in MATLAB. Proceedings of the CACSD Conference, Taipei,Taiwan. <http://control.ee.ethz.ch/joloef/yalmip.php>. Monden, 1983 Moon, 1994, Multiproduct economic lot size with investment costs for setup reduction and quality improvement: review and extensions, International Journal of Production Research, 32, 2795, 10.1080/00207549408957100 Nash, 1995, Software survey: NLP, OR/MS Today, 22, 60 Nye, 2001, Optimal investment in setup reduction in manufacturing systems with WIP inventories, European Journal of Operational Research, 135, 128, 10.1016/S0377-2217(00)00308-8 Ouyang, 2002, Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process, Computers & Operations Research, 29, 1701, 10.1016/S0305-0548(01)00051-X Porteus, 1985, Investing in reduced setups in the EOQ model, Management Science, 31, 998, 10.1287/mnsc.31.8.998 Porteus, 1986, Optimal lot sizing, process quality improvement and setup cost reduction, Operations Research, 34, 137, 10.1287/opre.34.1.137 Schonberger, 1982 Sethi, 1990, Flexibility in manufacturing: a survey, International Journal of Flexible Manufacturing Systems, 2, 289, 10.1007/BF00186471 Shingo, 1985 Shingo, 1990 Spence, 1987, Setup reduction and increased effective capacity, Management Science, 33, 1291, 10.1287/mnsc.33.10.1291 Vörös, 1999, Lot sizing with quality improvement and setup time reduction, European Journal of Operational Research, 113, 568, 10.1016/S0377-2217(97)00447-5 Yang, 2004, Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment, International Journal of Production Research, 42, 853, 10.1080/00207540310001632448