Study on temporary filling material of synchronous grouting in the middle of shield
Tài liệu tham khảo
Sun, 2019, Development and some issues on exploitation and utilization of urban underground space in China and abroad, Tunnel Constr., 39, 699
Hong, 2019, Development and thinking of tunnels and underground engineering in China in recent 2 years (from 2017 to 2018), Tunnel Constr., 39, 710
Filbà, 2016, Tunnel boring machine collision with an ancient boulder beach during the excavation of the Barcelona city subway L10 line: A case of adverse geology and resulting engineering solutions, Eng. Geol., 200, 31, 10.1016/j.enggeo.2015.11.010
Guo, 2011, Assessing the cost of transfer inconvenience in public transport systems: A case study of the London Underground, Trans. Res. Part A: Policy Pract., 45, 91
Shen, 2014, Long-term settlement behavior of metro tunnels in the soft deposits of Shanghai, Tunn. Undergr. Space Technol., 40, 309, 10.1016/j.tust.2013.10.013
Yang, 2020, Influence of construction process of double-line shield tunnel crossing frame structure on ground settlement, Geotech. Geol. Eng., 38, 1531, 10.1007/s10706-019-01109-3
Tang, 2020, Prediction and analysis of replaceable scraper wear of slurry shield TBM in dense sandy ground: A case study of Sutong GIL Yangtze River Crossing Cable Tunnel, Tunn. Undergr. Space Technol., 95, 103090, 10.1016/j.tust.2019.103090
Jiang, 2003, Theoretical study and analysis of site observation on the influence of shield excavation on soft clays around tunnel, China J. Rock Mech. Eng., 22, 1514
Peila, 2015, Long term behavior of two component back-fill grout mix used in full face mechanized tunneling, Geam-Geoigegneria Ambientale e Mineraria., 144, 57
M. Thewes, C. Budach, Grouting of the annular gap in shield tunneling – an important factor for minimization of settlements and production performance, in: Proceedings of the ITA-AITES World Tunnel Congress, Safe Tunneling for the City and Environment, Budapest, Hungary, 2009.
Mohammad, 2017, Investigation into the effects of two component grout properties on surface settlements, Tunn. Undergr. Space Technol., 63, 205, 10.1016/j.tust.2017.01.004
Koyama, 2003, Present status and technology of shield tunneling method in Japan, Tunn. Undergr. Space Technol., 18, 145, 10.1016/S0886-7798(03)00040-3
Wallner, 1976, Propagation of sedimentation stable cement pastes in jointed rock, Rock Mech. Waterways Constr., 2, 49
W. Clarke, Performance characteristics of microfine cement, in: ASCE Geotechnical Conference, Atlanta, USA, 1984. pp. 14-18.
Kazemian, 2010, Effect of cement, sodium silicate, kaolinite and water on the viscosity of the grout, Sci. Res. Essays, 5, 3434
R. Yonekura, M. Kaga, Current Chemical Grout Engineering in Japan. In: ASCE Grouting Soil Improvement & Geosynthetics, New Orleans, USA, 1992.
P. Antunes, Testing Procedures for Two-Component Annulus Grouts. North American Tunneling Proceedings, USA, 2012.
Wang, 2019, Study on the long-term performance of cement-sodium silicate grout and its impact on segment lining structure in synchronous backfill grouting of shield tunnels, Tunn. Undergr. Space Technol., 92, 10.1016/j.tust.2019.103015
A. Ivantchev, J. Del Rio, Two-component backfill grouting for double shield TBMs. In: Proceedings of the ITA WTC World Tunnel Congress, Dubrovnik (HR), Croatia, 2015.
Todaro, 2020, Ultrasonic measurements for assessing the elastic parameters of two-component grout used in full-face mechanized tunnelling, Tunn. Undergr. Space Technol., 106, 10.1016/j.tust.2020.103630
Sha, 2018, Experimental study on performance of cement-based grouts admixed with fly ash, bentonite, superplasticizer and water glass, Constr. Build. Mater., 161, 282, 10.1016/j.conbuildmat.2017.11.034
L. Pellegrini, P. Perruzza, Sao Paulo Metro Project-Control of settlements in variable soil conditions through EPB pressure and bicomponent backfill grout, in: Rapid Excavation and Tunneling Conference. Nevada, American, 2009, pp: 1137-1153.
T. Hashimoto, J. Brinkman, T. Konda, Y. Kano, A. Feddema, Simultaneous backfill grouting, pressure development in construction phase and in the long term, tunnelling and underground space technology, in: Underground Space for Sustainable Urban Development. Proceedings of the 30th Ita-Aites World Tunnel Congress, Singapore, 2004.
Zhang, 2018, Formulation and performance of grouting materials for underwater shield tunnel construction in karst ground, Constr. Build. Mater., 187, 327, 10.1016/j.conbuildmat.2018.07.054
Sha, 2019, Performance and engineering application of effective micro-fine cement-based grout(EMCG) for water-rich sand strata, China J. Rock Mech. Eng., 38, 1420
Zhang, 2018, Experiment and application for grouting materials for karst under conditions of underground water flow before shield tunneling, China J. Rock Mech. Eng., 37, 2120
Z.F. Li, S.C. Li, R.T. Liu, et al., Development of the grouting material for reinforcing water-rich broken rock masses and its application, Rock Soil Mech. 37 (2016) 1937-1946. https://doi.org/ 10.16285/j.rsm.2016.07.014.
T. Wang, Experiment of shield synchronized grouting slurry using waste sand in sand layer, in: 3rd International Conference on Civil, Architectural and Hydraulic Engineering, Hangzhou, China, 2014, pp. 1600-1605. https://doi.org/10.4028/www.scientific.net/AMM.638-640.1600.
Wang, 2017, Experiment and application of new material for grouting of gangue based aquifer, J. China Coal Soc., 42, 2981
Hu, 2007, Corrosion resistance performance of grouting materials manufactured from industrial wastes, Chin. Ceram. Soc., 35, 472
Tian, 2011, Research on anti-aqueous solubility performance of alkali-activated industrial residue double solution grouting materials, Concrete, 10, 61
Jin, 2016, The first application of clay shock in Tianjin, Build. Constr., 6, 952
Xiong, 2018, Application of clay shock in shield tunneling through existing buildings, Constr. Technol., 32, 397
Y.X. Ma, Application of Clay Shock Method for Settlement Control in Shields Crossing the Existing Subway in Short Distance, 44 (2015) 94–98.
GB/T 22235-2008, Determination for viscosity of liquids. (2008).
ASTM (American Society for Testing and Materials), 2018
DB32/T 2283-2012, Standard for geotechnical testing method, (2012).
ASTM (American Society for Testing and Materials), 2008