The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector

Automation in Construction - Tập 18 - Trang 239-248 - 2009
Lara Jaillon1, C.S. Poon1
1Department of Civil and Structural Engineering, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong

Tài liệu tham khảo

CIRIA, 1999 Testa, 1972 Gibb, 1999 Richard, 2005, Industrialised building systems: reproduction before automation and robotics, Automation in Construction, 14, 442, 10.1016/j.autcon.2004.09.009 Chan, 2002, Public housing construction in Hong Kong a review of its design and construction innovations, Architectural Science Review, 45, 349, 10.1080/00038628.2002.9696950 Warszawski, 1999 MOM, MND, Ministry of Manpower, Ministry of National Development of Singapore, 1999, vol. 21, 43 Wong, 1985, 175 CIDB, Construction Industry Development Board, 1992 BCA, Building and Construction Authority of Singapore, 2005 Sarja, 1998, Open and industrialized building, vol. 222 Gibb, 2003, Re-engineering through pre-assembly: client expectations and drivers, Building Research & Information, 31, 146, 10.1080/09613210302000 BSRIA, 2003 BRE, Building Research Establishment, 2001 Goodier, 2007, Future opportunities for offsite in the UK, Construction Management and Economics, 25, 585, 10.1080/01446190601071821 FIP, Fédération Internationale de la précontrainte, 1986 Elliott, 1996 Yeung, 2003 Y.W. Mak, Prefabrication and industrialization of housing in Hong Kong, Master Thesis, The Hong Kong Polytechnic University, 1998. Chiang, 2006, Prefabrication and barriers to entry — a case study of public housing and institutional buildings in Hong Kong, Habitat International, 30, 482, 10.1016/j.habitatint.2004.12.004 Tam, 2007, Advancing the cause of precast construction in Kwai Chung, Hong Kong Engineer, 35, 9 Chan, 1998, The 4-day cycle construction method at Tong Ming Court Wong, 2003, Prefabrication building systems adopted in Hong Kong Wong, 1999, Public housing construction in Hong Kong: from building traditionally to the era of rationalization, vol. 2(1), 11 CIRC, Construction Industry Review Committee, 2001 Buildings Department, 2001 Buildings Department, 2002 Buildings Department, 2003 Chu, 2001, Prefabrication techniques for high-rise residential buildings, 25 Moore, 2001, Moving construction off-site, modular construction, 97 Chu, 2005, Precast concrete construction for buildings in Hong Kong, 216 Tam, 2007, Towards adoption of prefabrication in construction, Building and Environment, 42, 3642, 10.1016/j.buildenv.2006.10.003 Tam, 2005, Use of prefabrication to minimise construction waste — a case study approach, The International Journal of Construction Management, 5, 91, 10.1080/15623599.2005.10773069 Tam, 2007, Assessing the levels of material wastage affected by sub-contracting relationships and projects types with their correlations, Building and Environment, 42, 1471, 10.1016/j.buildenv.2005.12.023 HKHA, Hong Kong Housing Authority, 2007 Buildings Department, 2007 Integer Hong Kong, 2001, http://www.integer.com.hk. Chiang, 2008, Volume building as competitive strategy, Construction Management and Economics, 26, 161, 10.1080/01446190701749151 Fong, 2003, Building distinction green design and construction in The Orchards, 69 Arditi, 2000, Trends in productivity improvement in the US construction industry, Construction Management and Economics, 18, 15, 10.1080/014461900370915