A design procedure for cemented fill for open stoping operations

Mining Science and Technology - Tập 12 - Trang 333-343 - 1991
Longjin Chen1, Deyi Jiao1
1Department of Mining and Metallurgical Engineering, McGill University, 3480 University St., Montreal, Que., Canada

Tài liệu tham khảo

Thomas, 1989, The basics of the preparation of deslimed mill tailing hydraulic fill, 425 Mitchell, 1982, Model studies on cemented tailings used in mine backfill, Can. Geotech. J., 19, 14, 10.1139/t82-002 Smith, 1983, Large scale model tests to determine backfill strength requirements for pillar recovery at the Black Mountain Mine Arioglu, 1984, Design aspects of cemented aggregate fill mixes for tungsten stoping operations, Min. Sci. Technol., 1, 209, 10.1016/S0167-9031(84)90414-6 Askew, 1978, Backfill Research for pillar extraction at ZC/NBHC, 100 Chen, 1983, On several subjects in flat-back cut and fill stoping, 355 1989, 19 Nantel, 1983, Assessment of slag backfill properties for the Noranda Chadboume Project, CIM Bull., 57 American Society for Testing and Materials, Annual Book of ASTM Standards ASTM, Philadelphia, Pa., Sect. 4, pp. 142-151.