A design procedure for cemented fill for open stoping operations
Tài liệu tham khảo
Thomas, 1989, The basics of the preparation of deslimed mill tailing hydraulic fill, 425
Mitchell, 1982, Model studies on cemented tailings used in mine backfill, Can. Geotech. J., 19, 14, 10.1139/t82-002
Smith, 1983, Large scale model tests to determine backfill strength requirements for pillar recovery at the Black Mountain Mine
Arioglu, 1984, Design aspects of cemented aggregate fill mixes for tungsten stoping operations, Min. Sci. Technol., 1, 209, 10.1016/S0167-9031(84)90414-6
Askew, 1978, Backfill Research for pillar extraction at ZC/NBHC, 100
Chen, 1983, On several subjects in flat-back cut and fill stoping, 355
1989, 19
Nantel, 1983, Assessment of slag backfill properties for the Noranda Chadboume Project, CIM Bull., 57
American Society for Testing and Materials, Annual Book of ASTM Standards ASTM, Philadelphia, Pa., Sect. 4, pp. 142-151.
