Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry

International Journal of Production Economics - Tập 85 - Trang 251-262 - 2003
M.G. Gnoni1, R. Iavagnilio1, G. Mossa1, G. Mummolo1, A. Di Leva2
1Department of Mechanical and Management Engineering, Politecnico di Bari, Viale Japigia 182, Bari, Italy
2Bosch Braking Systems, Italy

Tài liệu tham khảo

Aucamp, 1987, A lot-sizing policy for production planning with application in MRP, International Journal of Production Research, 25, 1099 Benedettini, O., Iavagnilio, R., Mossa, G., Mummolo, G., Ranieri, L., 2001. Integrating resource allocation and simulation in project-type production planning and control of supply chains: A case from the aeronautics industry. Special Interest Group (SIG) on Advanced Techniques in Production Planning and Control Aalborg, Denmark, 28–29 August 2001. Bose, 2000, A model predictive framework for planning and scheduling problems, Computers and Chemical Engineering, 24, 329, 10.1016/S0098-1354(00)00469-5 Byrne, 1999, Production planning using a hybrid simulation—analytical approach, International Journal of Production Economic, 59, 305, 10.1016/S0925-5273(98)00104-2 Christopher, 2000, Supply chain migration from lean and functional to agile and customised, Supply Chain Management: An International Journal, 5, 206, 10.1108/13598540010347334 Cohen, 1988, Strategic analysis of integrated production–distribution systems, Operations Research, 36, 81, 10.1287/opre.36.2.216 Fox, 2000, Agent-oriented supply chain management, The International Journal of Flexible Manufacturing Systems, 12, 165, 10.1023/A:1008195614074 Frolich, 2001, Arcs of integration, Journal of Operations Management, 19, 185, 10.1016/S0272-6963(00)00055-3 Fulkerson, 1997, A response to dynamic change in the market place, Decision Support Systems, 21, 199, 10.1016/S0167-9236(97)00029-8 Gnoni, M.G., Iavagnilio, R., Mossa, G., Mummolo, G., 2000. Solving a lot sizing and scheduling problem by hybrid modelling. 3rd International Workshop on Advanced Techniques in Production Planning & Control, Florence, February 24–25. Florence University Press, Florence, http://www.unifi.it/e-press/inglese/index_eng.htm. Gopalakrishnan, 2000, A modified framework for modeling set-up carryover in the capacitated lot sizing problem, International Journal of Production Research, 38, 3421, 10.1080/002075400418324 Gopalakrishnan, 1995, A framework for modelling setup carryover in the capacitated lot sizing problem, International Journal of Production Research, 33, 1973, 10.1080/00207549508904793 Haag, 1996, The application of STEP in the automotive supply chain, Computers in Industry, 31, 223, 10.1016/S0166-3615(96)00053-X Lee, H.L., Billington, C., 1992. Managing supply chain inventory: Pitfalls and opportunities. Sloan Management Review (Spring) 65–75. Mummolo, G., Ranaldo, S., Iavagnilio, R., 1999. Integrating analytic and simulation models for FMS loading and AGV fleet sizing. 3rd International Conference on Engineering Design and Automation, Vancouver, August 1–4, pp. 813–824. Ozdamar, 1998, Hybrid heuristic for the capacitated lot sizing and loading problem with setup times and overtime decisions, European Journal of Operational Research, 110, 525, 10.1016/S0377-2217(97)00269-5 Petrovic, 1998, Modelling and simulation of a supply chain in an uncertain environment, European Journal of Operational Research, 109, 299, 10.1016/S0377-2217(98)00058-7 Pfohl, 2000, Inter-organizational logistics systems in flexible production networks An organizational capabilities perspective, International Journal of Physical Distribution & Logistic Management, 30, 388, 10.1108/09600030010336153 Proff, 2000, Hybrid strategies as a strategic challenge—the case of the German automotive industry, Omega, 28, 541, 10.1016/S0305-0483(00)00018-9 Sabri, 2000, A multi-objective approach to simultaneous strategic and operational planning in supply chain design, Omega, 28, 581, 10.1016/S0305-0483(99)00080-8 Shanthikumar, 1983, A unifying view of simulation/analytic models and modeling, Operations Research, 31, 1030, 10.1287/opre.31.6.1030 Shapiro, 1993, Optimizing the value chain, Interfaces, 22, 65 Shobrys, 2000, Planning, scheduling, and control systems, Computers and Chemical Engineering, 24, 163, 10.1016/S0098-1354(00)00508-1 Smith-Daniels, 1988, A model for lot sizing and sequencing in process industry, International Journal of Production Research, 26, 647, 10.1080/00207548808947890 Stevens, G., 1999. The role of logistics and IT in the European enterprise. In: Hadjiconstantinou, E. (Ed.). Quick Response in the Supply Chain. Springer, Berlin. Svensson, 2000, A conceptual framework for the analysis of vulnerability in supply chains, International Journal of Physical Distribution & Logistics Management, 30, 731, 10.1108/09600030010351444 Thomas, 1996, Coordinated supply chain management, European Journal of Operational Research, 94, 1, 10.1016/0377-2217(96)00098-7 Wei, 2000, A model for comparing supply chain schedule integration approaches, International Journal of Production Research, 38, 2099, 10.1080/002075400188528 Wu, 2001, Software agents for knowledge management, Experts Systems with applications, 20, 51, 10.1016/S0957-4174(00)00048-8