Akaguma E, Aruga K, Okuyama T (2017) Analysis on economic balances of clear cutting and regeneration operations in the Northern area of Tochigi prefecture. Bull Utsunomiya Univ For 53:69–77 (in Japanese)
Akay AE (2005) Determining cost and productivity of using animals in forest harvesting operations. Appl Sci Res 1(2):190–195
Aruga K (2016) Analyses on strip road networks and profitability of final felling operations considering regeneration expenses at Nasu in Tochigi prefecture, Japan. Eur J For Eng 2:74–81
Forestry Agency, The Ministry of Agriculture, Forestry and Fisheries of Japan (2017) Annual report on trends (I): forest and forestry. Fiscal year 2016 (summary). Tokyo
Forestry Mechanization Society (1999) Forestry machinery handbook. Tokyo (in Japanese)
Funaki T, Sugihara M (2012) Logging operation systems and the productivity for final cutting in Sugi artificial forest. Bull Shimane Pref Mount Reg Res Center 8:129–132 (in Japanese)
Gunji S, Yamamoto T, Aruga K, Nakahata C, Saito M (2017) Productivities and costs of clear cutting and regeneration operations in Utsunomiya city, Tochigi prefecture. Bull Utsunomiya Univ For 53:15–26 (in Japanese with English summary)
Japan Forest Technology Association (2010) Low-cost forestry operational systems establishment business report. Tokyo (in Japanese)
Katagiri T (2018) Comparative study of production cost for clear cutting between the vehicle logging system and cable logging system in Okayama Prefecture. J Jpn For Eng Soc 33:37–45 (in Japanese)
Melemez K, Tunay M, Emir T (2014) A comparison of productivity in five small-scale harvesting systems. Small Scale For 13:35–45
Mizuniwa Y, Nakahata C, Aruga K (2016) Comparative analyses on the cycle time, productivity, and cost between commercial thinning and clear-cutting operations in Nasu-machi Forest Owners’ Co-operative, Tochigi Prefecture, Japan. J For Res 21:99–104
Mizuniwa Y, Nakahata C, Aruga K (2018) Equations to estimate processing and forwarding costs, while considering log size: clear-cutting operations in Nasunogahara, Tochigi Prefecture, Japan. J For Res 23:64–71
Nakahata C, Yamamoto T, Saito M, Aruga K (2018) Analysis on profitability of clear cutting and regeneration operation based on results of log selling: a case study of Utsunomiya city, Tochigi prefecture. J Jpn For Eng Soc 33:59–66 (in Japanese with English summary)
Oh JH, Park BJ, Aruga K, Nitami T, Cha DS, Kobayashi H (2004) Ride quality evaluation of a small sized forestry machine. J Jpn For Eng Soc 19:97–106
Sawaguchi I (1996) Studies on forest-road evaluation and forest-road standards in mountain forests (I): characteristics of parameters for forest road evaluation. Bull For For Prod Res Inst 72:1–110 (in Japanese with English summary)
Spinelli R, Magagnotti N, Lombardini C (2010) Performance, capability and costs of small-scale cable yarding technology. Small-scale For 9:123–135
Tanaka R, Koike S, Liu C, Uemura R, Aruga K (2016) Productivities and costs of logging operations by a new work party. Bull Utsunomiya Univ For 52:1–13 (in Japanese with English summary)
Visser R, Spinelli R (2012) Determining the shape of the productivity function for mechanized felling and felling-processing. J For Res 17:397–402
Zenkoku Ringyo Kairyo Fukyu Kyokai (2001) Management of forestry mechanization. Tokyo (in Japanese)