Delays and cost overruns in the construction projects in the Gaza Strip
Tóm tắt
Từ khóa
Tài liệu tham khảo
Abdul‐Rahman, H., Yahya, I., Berawi, A. and Wah, L.W. (2008), “Conceptual delay mitigation model using a project learning approach in practice”, Construction Management and Economics, Vol. 26, pp. 15‐27.
Abdul‐Rahman, H., Berawi, A., Mohamed, O., Othman, M. and Yahya, I. (2006), “Delay mitigation in the Malaysian construction industry”, Journal of Construction Engineering and Management, Vol. 132 No. 2, pp. 125‐33.
Ahmed, S.M., Azhar, S., Kappagantula, P. and Gollapudi, D. (2003), “Delays in construction: a brief study of the Florida construction industry”, Proceedings of the 39th Annual Conference of the Associated Schools of Construction, Clemson University, Clemson, SC (final report, Miami, FL).
Aibinu, A.A. and Jagboro, G.O. (2002), “The effects of construction delays on project delivery in Nigerian construction industry”, International Journal of Project Management, Vol. 20 No. 8, pp. 593‐9.
Alaghbari, M.W., Khadir, M.R.A., Salim, A. and Emawati, . (2007), “The significant factors causing delay of building construction projects in Malaysia”, Journal of Engineering, Construction and Architectural Management, Vol. 14 No. 2, 8, pp. 192‐206, 8.
Al‐Khalil, M. and Al‐Ghafly, M. (1999a), “Delay in public utility projects in Saudi Arabia”, International Journal of Project Management, Vol. 17 No. 2, pp. 101‐6.
Al‐Khalil, M. and Al‐Ghafly, M. (1999b), “Important causes of delay in public utility projects in Saudi Arabia”, Journal of Construction Management and Economics, Vol. 17 No. 5, pp. 647‐55.
Alwi, S. and Hampson, K. (2003), “Identifying the important causes of delays in building construction projects”, Proceedings of the 9th East Asia‐Pacific Conference on Structural Engineering and Construction, Bali, Indonesia, available at: http://eprints.Qut.edu.au/secure/00004156/01/Bali‐Conference‐2003.doc.
Arditi, D., Akan, G. and Gurdamar, S. (1985), “Reasons for delays in public projects in Turkey”, Journal of Construction Management and Economics, Vol. 3 No. 12, pp. 171‐81.
Assaf, S.A. and Al‐Hejji, S. (2006), “Causes of delay in large construction projects”, International Journal of Project Management, Vol. 24 No. 4, pp. 349‐57.
Assaf, S.A., Al‐Khalil, M. and Al‐Hazmi, M. (1995), “Cause of delay in large building construction projects”, Journal of Management in Engineering, Vol. 11 No. 2, pp. 45‐50.
Chan, D. and Kumaraswamy, M. (1996), “An evaluation of construction time performance in the building industry”, Journal of Building and Environmental, Vol. 31 No. 6, pp. 569‐78.
Chan, D. and Kumaraswamy, M. (2002), “Compressing construction duration: lessons learned from Hong Kong Building Projects”, International Journal of Project Management, Vol. 20 No. 1, pp. 23‐35.
Charles, T.J. and Andrew, M.A. (1990), “Predictors of cost overrun rates”, Journal of Construction Engineering and Management, ASCE, Vol. 116 No. 3, pp. 548‐52.
Chimwaso, K.D. (2001), An Evaluation of Cost Performance of Public Projects; Case of Botswana, Department of Architecture and Building Services, Gaborone.
Dayton, K. and Erickson, D. (2006), “Information about rising construction costs in Washington state”, report No. 360‐705‐7821, Department of Transportation, Washington State.
Enshassi, A., Mohammed, S. and Abu Mosa, J. (2008), “Risk management in building projects: contractors' perspective”, Emirates Journal for Engineering Research, Vol. 13 No. 1, pp. 29‐44.
Enshassi, A., Lisk, R., Sawalhi, I. and Radwan, I. (2003), “Contributors to construction delays in Palestine”, The Journal of American Institute of Constructors, Vol. 27 No. 2, pp. 45‐53.
Faridi, A.S. and El‐Sayegh, S.M. (2006), “Significant factors causing delay in UAE construction industry”, Construction Management and Economics, Vol. 24, pp. 1167‐76.
Fong, N., Wong, L.Y. and Wong, L.T. (2006), “Fire services installation related contributors of construction delay”, Journal of Building and Environment, Vol. 41, pp. 211‐22.
Frimpongs, Y., Oluwoye, J. and Crawford, L. (2003), “Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study”, International Journal of Project Management, Vol. 21 No. 5, pp. 321‐6.
Jackson, J. (1999), Facility Construction Cost Overruns: Analysis for Navy Construction Contracts, report for CE675‐Civil Engineering Department, North Carolina State University, Raleigh, NC.
Kaming, P., Olomolaiye, P., Holt, G. and Harris, F.C. (1997), “Factors influencing construction time and cost overruns on high‐rise projects in Indonesia”, Journal of Construction Management and Economics, Vol. 15 No. 1, pp. 83‐94.
Koushki, P.A., Al‐Rashid, K. and Kartam, N. (2005), “Delays and cost increases in the construction of private residential projects in Kuwait”, Journal of Construction Management and Economics, Vol. 23 No. 3, pp. 285‐94.
Kumaraswamy, M.M. (2006), “Accelerating construction industry development”, Journal of Construction in Developing Countries', Vol. 11 No. 1, pp. 73‐96.
Kumaraswamy, M.M. and Chan, D. (1998), “Contributors to construction delays”, Journal of Construction Management and Economics, Vol. 16 No. 1, pp. 17‐29.
Lo, T., Fung, I. and Tung, K. (2006), “Construction delay in Hong Kong civil engineering projects”, Journal of Construction Engineering and Management, Vol. 132 No. 6, pp. 636‐49.
Mezher, T.C. and Tawil, W. (1998), “Causes of delay in the construction industry in Lebanon”, Engineering Construction and Architectural Management, Vol. 5 No. 3, pp. 252‐60.
Morris, S. (1990), “Cost and time overruns in public sector projects”, Economic and Political Weekly, Vol. xxv No. 47, pp. M 154‐68.
Odeh, A. and Battaineh, H.T. (2002), “Causes of construction delay: traditional contracts”, International Journal of Project Management, Vol. 20 No. 1, pp. 67‐73.
Ogunlana, S., Promkuntong, K. and Jearkjirm, V. (1996), “Construction delays in a fast‐growing economy: comparing Thailand with other economics”, International Journal of Project Management, Vol. 14 No. 1, pp. 37‐45.
Okpala, C.C. and Aniekwu, A.N. (1988), “Causes of high costs of construction in Nigeria”, Journal of Construction Engineering and Management, ASCE, Vol. 114 No. 2, pp. 233‐4.
Palestine Contractors Union (2004), Reports 2004, Palestine Contractors Union.
Poilt, D. and Hungler, B. (1985), Essentials of Nursing Research; Methods and Applications, J.B. Lippincott, Philadelphia, PA.
Raufaste, N. and Callahan, J. (2002), Map Overview, A Draft Strategic to Improve the Competitiveness of the West Bank and Gaza Strip Construction Sector, Palestine.
Sambasivan, M. and Soon, Y. (2007), “Causes and effects of delays in Malaysian construction industry”, International Journal of Project Management, Vol. 25 No. 5, pp. 517‐26.
Vidalis, M.S. and Najafi, T.F. (2002), “Cost and time overruns in highway construction”, paper presented at 4th Transportation Conference of the Canadian Society for Civil Engineering, Montreal, Quebec, June 5‐8.
Wang, J., Fisher, N., Sun, C. and Wu, D. (2003), “An analysis of the distribution of time variance for building projects”, The International Journal of Construction Management, Vol. 3 No. 1, pp. 73‐82.
Zaki, M.K. and James, E.D. (1987), “Concurrent delays in construction projects”, Journal of Construction Engineering and Management, ASCE, Vol. 113 No. 4, pp. 591‐602.
Zhu, K. and Lin, L. (2004), “A stage‐by‐stage factor control frame work for cost estimation of construction projects”, paper presented at Owners Driving Innovation International Conference, available at: http://flybjerg.Plan.aau.dk/JAPAASPUBLISH ED.pelf.