Optimized flowshop scheduling of multiple production lines for precast production

Automation in Construction - Tập 72 - Trang 321-329 - 2016
Zhitian Yang1, Zhiliang Ma1, Song Wu2
1Tsinghua University, Beijing, China
2University of Huddersfield, Huddersfield, UK

Tài liệu tham khảo

Asprova Benjaoran, 2005, Flowshop scheduling model for bespoke precast concrete production planning, Constr. Manag. Econ., 23, 93, 10.1080/0144619042000287732 Benjaoran, 2006, Intelligence approach to production planning system for bespoke precast concrete products, Autom. Constr., 15, 737, 10.1016/j.autcon.2005.09.007 Chan, 2000, Precast Production Scheduling with Genetic Algorithms, 1087, 10.1109/CEC.2000.870768 Chan, 2002, Production scheduling for precast plants using a flowshop sequencing model, J. Comput. Civ. Eng., 16, 165, 10.1061/(ASCE)0887-3801(2002)16:3(165) Crossover (genetic algorithm) Khalili, 2013, Integrated prefabrication configuration and component grouping for resource optimization of precast production, J. Constr. Eng. Manag., 140, 10.1061/(ASCE)CO.1943-7862.0000798 Ko, 2010, GA-based decision support systems for precast production planning, Autom. Constr., 19, 907, 10.1016/j.autcon.2010.06.004 Ko, 2011, Precast production scheduling using multi-objective genetic algorithms, Expert Syst. Appl., 38, 8293, 10.1016/j.eswa.2011.01.013 Larranaga, 1996, Learning Bayesian network structures by searching for the best ordering with genetic algorithms, IEEE Trans. Syst. Man Cybern. Part A Syst. Humans, 26, 487, 10.1109/3468.508827 Lei, 2012, Minimizing makespan for scheduling stochastic job shop with random breakdown, Appl. Math. Comput., 218, 11851, 10.1016/j.amc.2012.04.091 Leu, 2002, GA-based resource-constrained flow-shop scheduling model for mixed precast production, Autom. Constr., 11, 439, 10.1016/S0926-5805(01)00083-8 Lipowski, 2012, Roulette-wheel selection via stochastic acceptance, Physica A, 391, 2193, 10.1016/j.physa.2011.12.004 Matlab Quadratic mean Tharmmaphornphilas, 2013, Formula selection and scheduling for precast concrete production, Int. J. Prod. Res., 51, 5195, 10.1080/00207543.2013.795250 Tormos, 2008, 255, 10.1007/978-3-540-78985-7_10 Wall, 1996, A Genetic Algorithm for Resource-Constrained Scheduling, massachusetts Institute of Technology, 85, 231 Wang, 2009, Fractal image compression based on spatial correlation and hybrid genetic algorithm, J. Vis. Commun. Image Represent., 20, 505, 10.1016/j.jvcir.2009.07.002 Wu, 1993, One-machine rescheduling heuristics with efficiency and stability as criteria, Comput. Oper. Res., 20, 1, 10.1016/0305-0548(93)90091-V Zhai, 2006, A Simulation-GA Based Model for Production Planning in Precast Plant, 1796, 10.1109/WSC.2006.322957