Optimized flowshop scheduling of multiple production lines for precast production
Tài liệu tham khảo
Asprova
Benjaoran, 2005, Flowshop scheduling model for bespoke precast concrete production planning, Constr. Manag. Econ., 23, 93, 10.1080/0144619042000287732
Benjaoran, 2006, Intelligence approach to production planning system for bespoke precast concrete products, Autom. Constr., 15, 737, 10.1016/j.autcon.2005.09.007
Chan, 2000, Precast Production Scheduling with Genetic Algorithms, 1087, 10.1109/CEC.2000.870768
Chan, 2002, Production scheduling for precast plants using a flowshop sequencing model, J. Comput. Civ. Eng., 16, 165, 10.1061/(ASCE)0887-3801(2002)16:3(165)
Crossover (genetic algorithm)
Khalili, 2013, Integrated prefabrication configuration and component grouping for resource optimization of precast production, J. Constr. Eng. Manag., 140, 10.1061/(ASCE)CO.1943-7862.0000798
Ko, 2010, GA-based decision support systems for precast production planning, Autom. Constr., 19, 907, 10.1016/j.autcon.2010.06.004
Ko, 2011, Precast production scheduling using multi-objective genetic algorithms, Expert Syst. Appl., 38, 8293, 10.1016/j.eswa.2011.01.013
Larranaga, 1996, Learning Bayesian network structures by searching for the best ordering with genetic algorithms, IEEE Trans. Syst. Man Cybern. Part A Syst. Humans, 26, 487, 10.1109/3468.508827
Lei, 2012, Minimizing makespan for scheduling stochastic job shop with random breakdown, Appl. Math. Comput., 218, 11851, 10.1016/j.amc.2012.04.091
Leu, 2002, GA-based resource-constrained flow-shop scheduling model for mixed precast production, Autom. Constr., 11, 439, 10.1016/S0926-5805(01)00083-8
Lipowski, 2012, Roulette-wheel selection via stochastic acceptance, Physica A, 391, 2193, 10.1016/j.physa.2011.12.004
Matlab
Quadratic mean
Tharmmaphornphilas, 2013, Formula selection and scheduling for precast concrete production, Int. J. Prod. Res., 51, 5195, 10.1080/00207543.2013.795250
Tormos, 2008, 255, 10.1007/978-3-540-78985-7_10
Wall, 1996, A Genetic Algorithm for Resource-Constrained Scheduling, massachusetts Institute of Technology, 85, 231
Wang, 2009, Fractal image compression based on spatial correlation and hybrid genetic algorithm, J. Vis. Commun. Image Represent., 20, 505, 10.1016/j.jvcir.2009.07.002
Wu, 1993, One-machine rescheduling heuristics with efficiency and stability as criteria, Comput. Oper. Res., 20, 1, 10.1016/0305-0548(93)90091-V
Zhai, 2006, A Simulation-GA Based Model for Production Planning in Precast Plant, 1796, 10.1109/WSC.2006.322957