A novel rigid–flexible combined sampler for lunar exploration
Tài liệu tham khảo
Ouyang, 2002, Development of space detection and the developing strategy of China [J], Aerosp. China, 12, 28
Dimarogonas, 2001
Artobolevski, 1975, Mechanisms in Modern Engineering Design
Stakheev, 1976, Comparative characteristics of the lunar-soil particle-size distribution at the landing sites of the automatic lunar stations Luna 16 and Luna 20[J], Cosmic Res., 14, 381
Ashitey, 2005, Robotic Arm In-Situ Operations for the Mars Exploration Rovers Surface Mission [C]
Bucek, 2008, Experimental Measurements of Excavation Forces in Lunar Soil Test Beds [C]
Hill, 2003, Tethered, down-hole-motor drilling system — a benefit to mars exploration [J], Adv. Space Res., 31, 2321, 10.1016/S0273-1177(03)00562-3
Erickson, 2002, Mars Exploration Rover Surface Operations [C]
Ding, 2009, Multi-rod deep driller for lunar subsurface sampling [J], J. Astronaut., 30, 1189
Kubota, 2005, Study on Mole-Typed Deep Driller Robot for Subsurface Exploration [C]
Bar-Cohen, 2003, Ultrasonic/Sonic Sampler and Sensor Platform for In-Situ Planetary Exploration [C]
Badescu, 2008, Rotary Hammer Ultrasonic/Sonic Drill System [C]
Chondros, 2010, Archimedes life works and machines, J. Mech. Mach. Theory, 45, 1766, 10.1016/j.mechmachtheory.2010.05.009
Lu, 2011, Design and dynamic analysis on coiling type of lunar sampler [J], Spacecr. Eng., 20, 112
Hartenberg, 1964
Lu, 2010, Design and Analysis of Spring Roll-Style Retractable Sampling Arm [C], 2374
Dimarogonas, 2013
Dimarogonas, 1996