Quality defaults and work-in-process inventory

European Journal of Operational Research - Tập 80 - Trang 240-251 - 1995
Carlos Cordon1
1IMD, Ch. de Bellerive 23, CH-1001 Lausanne, Switzerland

Tài liệu tham khảo

Bohn, 1988, Learning in Noisy Manufacturing Environments: An alternative to the Learning Curve, Harvard Business School Working Paper 88-070 Conway, 1988, The Role of Work-in-Process Inventory in Serial Production Lines, Operations Research, 36/2, 229, 10.1287/opre.36.2.229 Fine, 1989, Dynamic Process Improvement, Operations Research, 37, 580, 10.1287/opre.37.4.580 Hsu, 1988, Quality control of the M/G/1 queue, European Journal of Operational Research, 42, 88, 10.1016/0377-2217(89)90060-X Lee, 1992, Lot Sizing to Reduce Capacity Utilization in a Production Process with Defective Items, Process Corrections, and Rework, Management Science, 38, 1314, 10.1287/mnsc.38.9.1314 Lee, 1987, Simultaneous determination of production cycle and inspection schedules in a production systems, Management Science, 33, 1125, 10.1287/mnsc.33.9.1125 Lee, 1992, Production control in a kanban-like system with defective outputs, International Journal of Production Economics, 28, 143, 10.1016/0925-5273(92)90027-5 Porteus, 1986, Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction, Operations Research, 34, 137, 10.1287/opre.34.1.137 Rosenblatt, 1986, Economic Production Cycles with Imperfect Production Processes, IIE Transactions, 18, 48, 10.1080/07408178608975329 Schonberger, 1982