Stochastic integrated manufacturing and remanufacturing model with shortage, rework and quality based return rate in a closed loop supply chain
Tài liệu tham khảo
Blackburn, 2004, Reverse supply chains for commercial returns, Calif. Manag. Rev., 46, 6, 10.2307/41166207
Cárdenas-Barrón, 2013, Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework, Math. Comput. Appl., 18, 132
Cárdenas-Barrón, 2013, An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments, Appl. Math. Model., 37, 5549, 10.1016/j.apm.2012.10.017
Cárdenas-Barrón, 2014, Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris, Int. J. Prod. Econ., 155, 1, 10.1016/j.ijpe.2014.07.002
Chung, 2001, A comparison of waste-reduction practices and new environmental paradigm of rural and urban Chinese citizens, J. Environ. Manag., 62, 3
Dobos, 2003
Dobos, 2004, An extended production/recycling model with stationary demand and return rates, Int. J. Prod. Econ., 90, 311, 10.1016/j.ijpe.2003.09.007
Dobos, 2006, A production/recycling model with quality consideration, Int. J. Prod. Econ., 104, 571, 10.1016/j.ijpe.2005.09.006
Dutta, 2016, "Design and planning of a closed-loop supply chain with three way recovery and buy-back offer, J. Clean. Prod., 135, 604, 10.1016/j.jclepro.2016.06.108
El Saadany, 2008, The EOQ repair and waste disposal model with switching costs, Comput. Industrial Eng., 55, 219, 10.1016/j.cie.2008.01.016
El Saadany, 2010, A production/remanufacturing inventory model with price and quality dependant return rate, Comput. Industrial Eng., 58, 352, 10.1016/j.cie.2009.01.017
El Saadany, 2011, A production/remanufacture model with returns' subassemblies managed differently, Int. J. Prod. Econ., 133, 119, 10.1016/j.ijpe.2010.08.014
El Saadany, 2013, How many times to remanufacture?, Int. J. Prod. Econ., 143, 598, 10.1016/j.ijpe.2011.11.017
Fleischmann, 1997, Quantitative models for reverse logistics: a review, Eur. J. operational Res., 103, 1, 10.1016/S0377-2217(97)00230-0
Galbreth, 2006, Optimal acquisition and sorting policies for remanufacturing, Prod. Operations Manag., 15, 384, 10.1111/j.1937-5956.2006.tb00252.x
Giri, 2015, Optimizing a closed-loop supply chain with manufacturing defects and quality dependent return rate, J. Manuf. Syst., 35, 92, 10.1016/j.jmsy.2014.11.014
Giri, 2016, Optimal production policy for a closed-loop hybrid system with uncertain demand and return under supply disruption, J. Clean. Prod., 112, 2015, 10.1016/j.jclepro.2015.06.147
Govindan, 2016, A review of reverse logistics and closed-loop supply chains: a Journal of Cleaner Production focus, J. Clean. Prod.
Guo, 2011, Models for recycling and production policy for a closed-loop system, J. Qual., 18, 303
Guo, 2015, Optimal strategies for manufacturing/remanufacturing system with the consideration of recycled products, Comput. Industrial Eng., 89, 226, 10.1016/j.cie.2014.11.020
Hasanov, 2012, Production, remanufacturing and waste disposal models for the cases of pure and partial backordering, Appl. Math. Model., 36, 5249, 10.1016/j.apm.2011.11.066
Hasanov, 2013, Closed-loop supply chain system with energy, transportation and waste disposal costs, Int. J. Sustain. Eng., 6, 352, 10.1080/19397038.2012.762433
Hwang, 2009, A closed-loop recycling system with a minimum allowed quality level on returned products, Int. J. Serv. Operations Manag., 5, 758, 10.1504/IJSOM.2009.026773
Inderfurth, 2005, Lot sizing in a production system with rework and product deterioration, Int. J. Prod. Res., 43, 1355, 10.1080/0020754042000298539
Jaber, 2009, The production, remanufacture and waste disposal model with lost sales, Int. J. Prod. Econ., 120, 115, 10.1016/j.ijpe.2008.07.016
Jaber, 2011, An economic production and remanufacturing model with learning effects, Int. J. Prod. Econ., 131, 115, 10.1016/j.ijpe.2009.04.019
Jaber, 2008, The economic order quantity repair and waste disposal model with entropy cost, Eur. J. Operational Res., 188, 109, 10.1016/j.ejor.2007.03.016
Jamal, 2004, Optimal manufacturing batch size with rework process at a single-stage production system, Comput. Industrial Eng., 47, 77, 10.1016/j.cie.2004.03.001
Koh, 2002, An optimal ordering and recovery policy for reusable items, Comput. Industrial Eng., 43, 59, 10.1016/S0360-8352(02)00062-1
Konstantaras, 2006, Lot-sizing for a single-product recovery system with backordering, Int. J. Prod. Res., 44, 2031, 10.1080/00207540500380924
Konstantaras, 2010, Lot sizing for a recoverable product with inspection and sorting, Comput. Industrial Eng., 58, 452, 10.1016/j.cie.2009.11.004
Korugan, 2013, On the quality variation impact of returns in remanufacturing, Comput. Ind. Eng., 64, 929, 10.1016/j.cie.2013.01.003
Mabini, 1992, EOQ type formulations for controlling repairable inventories, Int. J. Prod. Econ., 28, 21, 10.1016/0925-5273(92)90110-S
Mohammadi, 2015, Optimizing integrated manufacturing and products inspection policy for deteriorating manufacturing system with imperfect inspection, J. Manuf. Sys., 37, 299, 10.1016/j.jmsy.2014.08.002
Nahmiasj, 1979, A deterministic model for a repairable item inventory system with a finite repair rate†, Int. J. Prod. Res., 17, 215, 10.1080/00207547908919609
Richter, 1996, The extended EOQ repair and waste disposal model, Int. J. Prod. Econ., 45, 443, 10.1016/0925-5273(95)00143-3
Richter, 1997, Pure and mixed strategies for the EOQ repair and waste disposal problem, Operations-Research-Spektrum, 19, 123, 10.1007/BF01545511
Richter, 1999, Analysis of the EOQ repair and waste disposal problem with integer setup numbers, Int. J. Prod. Econ., 59, 463, 10.1016/S0925-5273(98)00110-8
Sarkar, 2014, Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process, Int. J. Prod. Econ., 155, 204, 10.1016/j.ijpe.2013.11.014
Sarkar, 2016, Product inspection policy for an imperfect production system with inspection errors and warranty cost, Eur. J. Operational Res., 248, 263, 10.1016/j.ejor.2015.06.021
Sarkar, 2010, Optimal reliability, production lotsize and safety stock: an economic manufacturing quantity model, Int. J. Manag. Sci. Eng. Manag., 5, 192
Sarkar, 2011, An imperfect production process for time varying demand with inflation and time value of money–An EMQ model, Expert Syst. Appl., 38, 13543
Sarkar, 2014, An economic production quantity model with random defective rate, rework process and backorders for a single stage production system, J. Manuf. Syst., 33, 423, 10.1016/j.jmsy.2014.02.001
Schrady, 1967, A deterministic inventory model for reparable items, Nav. Res. Logist. Q., 14, 391, 10.1002/nav.3800140310
Singh, 2013, A closed loop supply chain system with flexible manufacturing and reverse logistics operation under shortages for deteriorating items, Procedia Technol., 10, 330, 10.1016/j.protcy.2013.12.368
Stock, 2006, Doctoral research in supply chain management and/or logistics-related areas: 1999–2004, J. Bus. Logist., 27, 139, 10.1002/j.2158-1592.2006.tb00244.x
Taleizadeh, 2013, An economic order quantity model with known price increase and partial backordering, Eur. J. Operational Res., 28, 516, 10.1016/j.ejor.2013.02.014
Taleizadeh, 2010, Multi product EPQ model with scraped items and limited production capacity, Int. J. Sci. Technol. Sci. Iran. Transaction E, 17, 58
Taleizadeh, 2010, Replenish-up-to multi chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs, Int. J. Syst. Sci., 41, 1187, 10.1080/00207720903171761
Taleizadeh, 2010, A genetic algorithm to optimize multi-product multi-constraint inventory control systems with stochastic replenishments and discount, Int. J. Adv. Manuf. Technol., 51, 311, 10.1007/s00170-010-2604-8
Taleizadeh, 2011, Meta-heuristic algorithms to solve the fuzzy single period problem, Math. Comput. Model., 54, 1273, 10.1016/j.mcm.2011.03.038
Taleizadeh, 2012, An economic order quantity model with partial backordering and a special sale price, Eur. J. Operational Res., 221, 571, 10.1016/j.ejor.2012.03.032
Taleizadeh, 2013, A hybrid method of fuzzy simulation and genetic algorithm to optimize multi-product single-constraint inventory control systems with stochastic replenishments and fuzzy-demand, Inf. Sci., 220, 425, 10.1016/j.ins.2012.07.027
Taleizadeh, 2013, An economic order quantity model with multiple partial prepayments and partial backordering, Math. Comput. Model., 57, 311, 10.1016/j.mcm.2012.07.002
Taleizadeh, 2013, Economic production quantity model with repair failure and limited capacity, Appl. Math. Model., 37, 2765, 10.1016/j.apm.2012.06.006
Taleizadeh, 2013, An EOQ model for perishable product with special sale and shortage, Int. J. Prod. Econ., 145, 318, 10.1016/j.ijpe.2013.05.001
Taleizadeh, 2014, Multi-product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process, Int. J. Prod. Econ., 150, 9, 10.1016/j.ijpe.2013.11.023
Taleizadeh, 2015, Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items, Int. J. Prod. Econ., 159, 285, 10.1016/j.ijpe.2014.09.009
Teunter, 1998
Teunter, 2001, Economic ordering quantities for recoverable item inventory systems, Nav. Res. Logist. (NRL), 48, 484, 10.1002/nav.1030
Teunter, 2004, Lot-sizing for inventory systems with product recovery, Comput. Industrial Eng., 46, 431, 10.1016/j.cie.2004.01.006
Tibben-Lembke, 2002, Differences between forward and reverse logistics in a retail environment, Supply Chain Manag. An Int. J., 7, 271, 10.1108/13598540210447719
Treviño-Garza, 2015, Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products, Int. J. Syst. Sci., 46, 1705, 10.1080/00207721.2014.886750
Tsai, 2012, Optimal ordering and production policy for a recoverable item inventory system with learning effect, Int. J. Syst. Sci., 43, 349, 10.1080/00207721.2010.502261
Vörös, 2002, Product balancing under conditions of quality inflation, cost pressures and growth strategies, Eur. J. Operational Res., 141, 153, 10.1016/S0377-2217(01)00272-7
Wee, 2013, An alternative analysis and solution procedure for the EPQ model with rework process at a single-stage manufacturing system with planned backorders, Comput. Industrial Eng., 64, 748, 10.1016/j.cie.2012.11.005
Xin-jun, 2008, Monopoly production optimization problem for remanufacturing cost with stochastic distribution, Control Decis., 1, 008
