Modeling just-in-time purchasing in the ready mixed concrete industry

International Journal of Production Economics - Tập 107 - Trang 190-201 - 2007
Wu Min1, Low Sui Pheng2
1School of Management, Chongqing Jiao Tong University, No. 66 Xuefu Road, Nan’an District, Chongqing 400074, PR China
2Department of Building, National University of Singapore, 4 Architecture Drive, 117566 Singapore, Singapore

Tài liệu tham khảo

Anson, 2002, Measurement of the performance of ready mixed concrete resources as data for simulation, Construction Management and Economics, 20, 237, 10.1080/01446190210121297 Cao, 2004, A revised EMQ/JIT production-run model: An examination of inventory and production costs, International Journal of Production Economics, 87, 83, 10.1016/S0925-5273(03)00094-X Charabarty, 1998, An EOQ model for items with Weibull distribution deterioration, shortages and trend demand: an extension of Philip's model, Computers and Operations Research, 25, 649, 10.1016/S0305-0548(97)00081-6 Cheng, 1996 Chongqing Municipal Bureau, 1999. New Policies and Measures on Sand Mining along Rivers, Government in-house report. Fazel, 1997, A comparative analysis of inventory cost of JIT and EOQ, International Journal of Physical Distribution and Logistics Management, 27, 496, 10.1108/09600039710182680 Gaither, 1996 Grace Construction Product, 2003. What types of chemical admixtures are available today? ASTM C494, retrieved in June, 〈www.na.graceconstruction.com〉. Harris, 1915 Johnson, 1993, Not quite just-in-time inventories, The National Public Accountant, 38, 26 Low, 1997 Low, 2001, Just-in-time management of precast concrete components, ASCE Journal of Construction Engineering and Management, 127, 494, 10.1061/(ASCE)0733-9364(2001)127:6(494) Low, 2005, Just-in-time management in the ready-mixed concrete industry of Chongqing, China, International Journal of Construction Management, 5, 21, 10.1080/15623599.2005.10773065 Monden, 1998 Peterson, 2002, The misplaced origin of Just-in-time production methods, Management Decision, 40, 82, 10.1108/00251740210413398 Ray, 1997, An EOQ model with stock-dependent demand, shortage, inflation and time discounting, International Journal of Production Economics, 53, 171, 10.1016/S0925-5273(97)00112-6 Schniederjans, 2001, An alternative analysis of inventory costs of JIT and EOQ, International Journal of Physical Distribution and Logistics Management, 31, 109, 10.1108/09600030110387507 Schonberger, R.J., 1982. A revolutionary way to streamline the factory. The Wall Street Journal, 24. Silver, 1998 Singh, K., 2003. Just-in-time systems thrown into chaos suppliers rush to meet orders, The Straits Time, 20 March, Singapore. Temponi, 1995, Implementation of two JIT elements in small-sized manufacturing firms, Production and Inventory Management Journal, 36, 23 Tommelein, I.D., Li, A.E.Y., 1999. Just-in-time concrete delivery: mapping alternatives for vertical supply chain integration. In: Tommelein, I.D., Ballard G. (Eds.), Proceedings of the Seventh Annual Conference of the International Group for Lean Construction, Berkeley, California, pp. 159–170. Vokurka, 1996, Just-in-time: the evolution of a philosophy, Production and Operations Management Journal, 38, 47 Wang, 2002, Scheduling the truckmixer arrival for a ready mixed concrete pour via simulation with a risk, Journal of Construction Research, 2, 169 Wu, M., Low, S.P., 2003. Just-in-time management for ready mixed concrete suppliers in Singapore. In: Proceedings of the Joint International Symposium of CIB W55, W 65 and W107, Singapore, pp. 175–186. Wu, 2006, EOQ, JIT and fixed costs in the ready-mixed concrete industry, International Journal of Production Economics, 102, 167, 10.1016/j.ijpe.2005.03.002 Zhu, 1994, Defining critical elements in JIT implementation: a survey, Industrial Management and Data Systems, 94, 3, 10.1108/02635579410063252