Modeling just-in-time purchasing in the ready mixed concrete industry
Tài liệu tham khảo
Anson, 2002, Measurement of the performance of ready mixed concrete resources as data for simulation, Construction Management and Economics, 20, 237, 10.1080/01446190210121297
Cao, 2004, A revised EMQ/JIT production-run model: An examination of inventory and production costs, International Journal of Production Economics, 87, 83, 10.1016/S0925-5273(03)00094-X
Charabarty, 1998, An EOQ model for items with Weibull distribution deterioration, shortages and trend demand: an extension of Philip's model, Computers and Operations Research, 25, 649, 10.1016/S0305-0548(97)00081-6
Cheng, 1996
Chongqing Municipal Bureau, 1999. New Policies and Measures on Sand Mining along Rivers, Government in-house report.
Fazel, 1997, A comparative analysis of inventory cost of JIT and EOQ, International Journal of Physical Distribution and Logistics Management, 27, 496, 10.1108/09600039710182680
Gaither, 1996
Grace Construction Product, 2003. What types of chemical admixtures are available today? ASTM C494, retrieved in June, 〈www.na.graceconstruction.com〉.
Harris, 1915
Johnson, 1993, Not quite just-in-time inventories, The National Public Accountant, 38, 26
Low, 1997
Low, 2001, Just-in-time management of precast concrete components, ASCE Journal of Construction Engineering and Management, 127, 494, 10.1061/(ASCE)0733-9364(2001)127:6(494)
Low, 2005, Just-in-time management in the ready-mixed concrete industry of Chongqing, China, International Journal of Construction Management, 5, 21, 10.1080/15623599.2005.10773065
Monden, 1998
Peterson, 2002, The misplaced origin of Just-in-time production methods, Management Decision, 40, 82, 10.1108/00251740210413398
Ray, 1997, An EOQ model with stock-dependent demand, shortage, inflation and time discounting, International Journal of Production Economics, 53, 171, 10.1016/S0925-5273(97)00112-6
Schniederjans, 2001, An alternative analysis of inventory costs of JIT and EOQ, International Journal of Physical Distribution and Logistics Management, 31, 109, 10.1108/09600030110387507
Schonberger, R.J., 1982. A revolutionary way to streamline the factory. The Wall Street Journal, 24.
Silver, 1998
Singh, K., 2003. Just-in-time systems thrown into chaos suppliers rush to meet orders, The Straits Time, 20 March, Singapore.
Temponi, 1995, Implementation of two JIT elements in small-sized manufacturing firms, Production and Inventory Management Journal, 36, 23
Tommelein, I.D., Li, A.E.Y., 1999. Just-in-time concrete delivery: mapping alternatives for vertical supply chain integration. In: Tommelein, I.D., Ballard G. (Eds.), Proceedings of the Seventh Annual Conference of the International Group for Lean Construction, Berkeley, California, pp. 159–170.
Vokurka, 1996, Just-in-time: the evolution of a philosophy, Production and Operations Management Journal, 38, 47
Wang, 2002, Scheduling the truckmixer arrival for a ready mixed concrete pour via simulation with a risk, Journal of Construction Research, 2, 169
Wu, M., Low, S.P., 2003. Just-in-time management for ready mixed concrete suppliers in Singapore. In: Proceedings of the Joint International Symposium of CIB W55, W 65 and W107, Singapore, pp. 175–186.
Wu, 2006, EOQ, JIT and fixed costs in the ready-mixed concrete industry, International Journal of Production Economics, 102, 167, 10.1016/j.ijpe.2005.03.002
Zhu, 1994, Defining critical elements in JIT implementation: a survey, Industrial Management and Data Systems, 94, 3, 10.1108/02635579410063252