A comprehensive review of flowshop group scheduling literature

Computers & Operations Research - Tập 70 - Trang 56-74 - 2016
Janis S. Neufeld1, Jatinder N.D. Gupta2, Udo Buscher1
1Department of Business Administration and Economics, TU Dresden, 01069 Dresden, Germany
2College of Business Administration, University of Alabama in Huntsville, Huntsville, AL 35899, USA

Tóm tắt

Từ khóa


Tài liệu tham khảo

Li, 2015, Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search, Expert Syst Appl, 42, 1409, 10.1016/j.eswa.2014.09.007

Ham, 1985

Wu, 2009, Hybrid simulated annealing algorithm with mutation operator to the cell formation problem with alternative process routings, Expert Syst Appl, 36, 3652, 10.1016/j.eswa.2008.02.060

Snead, 1989

Askin, 1993, A comparison of scheduling philosophies for manufacturing cells, Eur J Oper Res, 69, 438, 10.1016/0377-2217(93)90027-K

Wu, 2007, Genetic algorithms for integrating cell formation with machine layout and scheduling, Comput Ind Eng, 53, 277, 10.1016/j.cie.2007.06.021

Akturk, 2011, Joint cell loading and scheduling approach to cellular manufacturing systems, Int J Prod Res, 49, 6321, 10.1080/00207543.2010.532165

Papaioannou, 2010, The evolution of cell formation problem methodologies based on recent studies (1997–2008), Eur J Oper Res, 206, 509, 10.1016/j.ejor.2009.10.020

Kia, 2012, Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing, Comput Oper Res, 39, 2642, 10.1016/j.cor.2012.01.012

Schaller, 2000, A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell, Int J Prod Res, 38, 287, 10.1080/002075400189419

Salmasi, 2010, Total flow time minimization in a flowshop sequence-dependent group scheduling problem, Comput Oper Res, 37, 199, 10.1016/j.cor.2009.04.013

Wilson, 2004, Scheduling non-similar groups on a flow line, Robot Comput Integr Manuf, 20, 505, 10.1016/j.rcim.2004.07.002

Lin, 2003, A case study in a two-stage hybrid flow shop with setup time and dedicated machines, Int J Prod Econ, 86, 133, 10.1016/S0925-5273(03)00011-2

Celano, 2010, Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times, Int J Adv Manuf Technol, 46, 695, 10.1007/s00170-009-2112-x

Li, 1997, A hybrid two-stage flowshop with part family, batch production, major and minor set-ups, Eur J Oper Res, 102, 142, 10.1016/S0377-2217(96)00213-5

van der Zee, 2013, Family based dispatching with batch availability, Int J Prod Res, 51, 3643, 10.1080/00207543.2012.756590

van der Zee, 2011, Family based dispatching in manufacturing networks, Int J ProdRes, 49, 7059, 10.1080/00207543.2010.537704

Schaller, 2000, Scheduling a flowline manufacturing cell with sequence dependent family setup times, Eur J Oper Res, 125, 324, 10.1016/S0377-2217(99)00387-2

Bozorgirad, 2015, A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics, Int J Adv Manuf Technol, 1

Gelogullari, 2010, Group-scheduling problems in electronics manufacturing, J Sched, 13, 177, 10.1007/s10951-009-0147-3

Yang, 2008, Multi-family scheduling in a two-machine reentrant flow shop with setups, Eur J Oper Res, 187, 1160, 10.1016/j.ejor.2006.06.065

MacCawley A. The international wine supply chain: challenges from bottling to the glass [Ph.D. thesis]. Georgia Institute of Technology; 2014.

Hitomi, 1976, Operations scheduling for group technology applications, Ann CIRP, 25, 419

Vaithianathan, 1982, On scheduling in a gt environment, J Manuf Syst, 1, 149, 10.1016/S0278-6125(82)80025-3

Mahmoodi, 1991, A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell, Int J Prod Res, 29, 1923, 10.1080/00207549108948058

Flynn, 1987, Repetitive lots, J Oper Manag, 7, 203, 10.1016/0272-6963(87)90017-9

Allahverdi, 1999, A review of scheduling research involving setup considerations, Omega, 27, 219, 10.1016/S0305-0483(98)00042-5

Allahverdi, 2008, A survey of scheduling problems with setup times or costs, Eur J Oper Res, 187, 985, 10.1016/j.ejor.2006.06.060

Allahverdi, 2015, The third comprehensive survey on scheduling problems with setup times/costs, Eur J Oper Res, 246, 345, 10.1016/j.ejor.2015.04.004

Cheng, 2000, A review of flowshop scheduling research with setup times, Prod Oper Manag, 9, 262, 10.1111/j.1937-5956.2000.tb00137.x

Zhu, 2006, Scheduling and lot sizing with sequence-dependent setup, IIE Trans, 38, 987, 10.1080/07408170600559706

Filho, 2013, Scheduling in flow shop with sequence-dependent setup times, Int J Bus Innov Res, 7, 466, 10.1504/IJBIR.2013.054870

Potts, 2000, Scheduling with batching, Eur J Oper Res, 120, 228, 10.1016/S0377-2217(99)00153-8

Logendran R. Group scheduling for cellular manufacturing systems. In: Group technology and cellular manufacturing, Methodologies and applications. New York: Gordon and Breach Science Publishers; 1998. p. 153–208.

Rajendran, 1994, A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria, Int J Prod Res, 32, 2541, 10.1080/00207549408957083

Hendizadeh, 2008, Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times, Int J Prod Econ, 111, 593, 10.1016/j.ijpe.2007.02.031

Eddaly M, Jarboui B, Bouabda R, Rebai A. Hybrid estimation of distribution algorithm for permutation flowshop scheduling problem with sequence dependent family setup times. In: International conference on computers & industrial engineering, 2009, CIE 2009. Troyes: IEEE; 2009. p. 217–20.

Cheng, 2011, Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times, Expert Syst Appl, 38, 15517, 10.1016/j.eswa.2011.06.008

Lin, 2011, Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times, Int J Prod Econ, 130, 246, 10.1016/j.ijpe.2011.01.004

Garey, 1976, The complexity of flowshop and jobshop scheduling, Math Oper Res, 1, 117, 10.1287/moor.1.2.117

Lenstra, 1977, Complexity of machine scheduling problems, Ann Discrete Math, 1, 343, 10.1016/S0167-5060(08)70743-X

Koulamas, 1994, The total tardiness problem, Oper Res, 42, 1025, 10.1287/opre.42.6.1025

Gupta, 1986, The two-machine sequence dependent flowshop scheduling problem, Eur J Oper Res, 24, 439, 10.1016/0377-2217(86)90037-8

Kleinau, 1993, Two-machine shop scheduling problems with batch processing, Math Comput Model, 17, 55, 10.1016/0895-7177(93)90196-6

Logendran, 2005, Group scheduling in flexible flow shops, Int J Prod Econ, 96, 143, 10.1016/j.ijpe.2004.03.011

Behnamian, 2010, Due windows group scheduling using an effective hybrid optimization approach, Int J Adv Manuf Technol, 46, 721, 10.1007/s00170-009-2147-z

Karimi, 2010, Bi-objective group scheduling in hybrid flexible flowshop, Expert Syst Appl, 37, 4024, 10.1016/j.eswa.2009.09.005

Wang, 2002, Locating cells with bottleneck machines in cellular manufacturing systems, Int J Prod Res, 40, 403, 10.1080/00207540110073109

Solimanpur, 2004, A heuristic to minimize makespan of cell scheduling problem, Int J Prod Econ, 88, 231, 10.1016/S0925-5273(03)00196-8

Graham, 1979, Optimization and approximation in deterministic sequencing and scheduling, Ann Discrete Math, 5, 287, 10.1016/S0167-5060(08)70356-X

Pinedo M. Scheduling—theory, algorithms and systems, 4th edition, vol. 2. New Jersey: Springer; 2012.

Ribas, 2010, Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective, Comput Oper Res, 37, 1439, 10.1016/j.cor.2009.11.001

Franca, 2005, Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups, Comput Ind Eng, 48, 491, 10.1016/j.cie.2003.11.004

Lin, 2009, Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times, Comput Oper Res, 36, 1110, 10.1016/j.cor.2007.12.010

Nikjo, 2014, A non-permutation flow shop manufacturing cell scheduling problem with part׳s sequence dependent family setup times, Int J Appl Metaheuristic Comput, 5, 70, 10.4018/ijamc.2014100104

Chen, 2013, Effect of solution representations on tabu search in scheduling applications,, Comput Oper Res, 40, 2817, 10.1016/j.cor.2013.06.003

Chen, 2013, A comparison of two chromosome representation schemes used in solving a family-based scheduling problem, Robot Comput-Integr Manuf, 29, 21, 10.1016/j.rcim.2012.04.009

Liou, 2013, A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem, Int J Syst Sci, 44, 77, 10.1080/00207721.2011.581396

Liou, 2015, A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times, Int J Prod Econ, 170, 258, 10.1016/j.ijpe.2015.10.002

Logendran, 2006, Two-machine group scheduling problems in discrete 1020 parts manufacturing with sequence-dependent setups, Comput Oper Res, 33, 158, 10.1016/j.cor.2004.07.004

Shahvari, 2012, An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems, Int J Prod Res, 50, 4237, 10.1080/00207543.2011.604051

Keshavarz, 2013, Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem, Int J Prod Res, 51, 6182, 10.1080/00207543.2013.825055

Keshavarz, 2015, Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem, Ann Oper Res, 226, 351, 10.1007/s10479-014-1667-6

Norman, 1999, A genetic algorithm methodology for complex scheduling problems, Naval Res Logist, 46, 199, 10.1002/(SICI)1520-6750(199903)46:2<199::AID-NAV5>3.0.CO;2-L

Zandieh, 2009, Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops, Int J Adv Manuf Technol, 43, 767, 10.1007/s00170-008-1740-x

Karimi, 2011, Group scheduling in flexible flow shops, Int J Prod Res, 49, 4965, 10.1080/00207543.2010.481644

Ebrahimi, 2014, Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates, Appl Math Model, 38, 2490, 10.1016/j.apm.2013.10.061

Khamseh, 2015, Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops, Int J Adv Manuf Technol, 77, 173, 10.1007/s00170-014-6429-8

Bozorgirad, 2013, Bi-criteria group scheduling in hybrid flowshops, Int J Prod Econ, 145, 599, 10.1016/j.ijpe.2013.05.015

Radharamanan, 1986, A heuristic algorithm for group scheduling, Comput Ind Eng, 11, 204, 10.1016/0360-8352(86)90079-3

Logendran, 1991, Minimizing the makespan of a group scheduling problem, Int J Prod Econ, 22, 217, 10.1016/0925-5273(91)90098-E

Logendran, 1992, Group scheduling problem, Comput Ind Eng, 23, 113, 10.1016/0360-8352(92)90076-V

Sridhar, 1996, Scheduling in flowshop and cellular manufacturing systems with multiple objectives a genetic algorithmic approach, Prod Plan Control, 7, 374, 10.1080/09537289608930365

Rajendran, 1999, Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flowtime and weighted tardiness of jobs, Comput Ind Eng, 37, 671, 10.1016/S0360-8352(00)00003-6

Venkataramanaiah, 2008, Scheduling in cellular manufacturing systems, Int J Prod Res, 46, 429, 10.1080/00207540601138577

Henneberg, 2015, A constructive algorithm and a simulated annealing approach for solving flowshop problems with missing operations, Int J Prod Res, 1, 10.1080/00207543.2015.1082670

Cetinkaya, 1992, Unit sized transfer batch scheduling with setup times, Comput Ind Eng, 22, 177, 10.1016/0360-8352(92)90045-L

Logendran, 1993, Two-machine group scheduling problem with blocking and anticipatory setups, Eur J Oper Res, 69, 467, 10.1016/0377-2217(93)90029-M

Greene, 1986, Mixed integer program for loading and scheduling multiple flexible manufacturing cells, Eur J Oper Res, 24, 379, 10.1016/0377-2217(86)90031-7

Vickson, 1992, Two-and three-machine flow shop scheduling problems with equal sized transfer batches, Int J Prod Res, 30, 1551, 10.1080/00207549208948107

Sotskov, 1996, Heuristics for permutation flow shop scheduling with batch setup times, OR Spektr, 18, 67, 10.1007/BF01539731

Danneberg, 1999, A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size, Math Comput Model, 29, 101, 10.1016/S0895-7177(99)00085-0

Wang, 2005, Two-machine flowshop scheduling with job class setups to minimize total flowtime, Comput Oper Res, 32, 2751, 10.1016/j.cor.2004.04.002

Wang M-C, Rao Y-Q, Wang K-P. A niche genetic algorithm for two-machine flowshop scheduling with family sequence-dependent setup times and a common due window. In: 2010 IEEE international conference on industrial engineering and engineering management (IEEM). Singapore: IEEE; 2010. p. 296–300.

Schaller, 2012, Scheduling a permutation flow shop with family setups to minimise total tardiness, Int J Prod Res, 50, 2204, 10.1080/00207543.2011.575094

Pang, 2013, A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness, Int J Prod Econ, 141, 127, 10.1016/j.ijpe.2012.06.017

Shen, 2014, Flow shop batching and scheduling with sequence-dependent setup times, J Sched, 17, 353, 10.1007/s10951-014-0369-x

Yang, 2002, Group scheduling in a two-stage flowshop, J Oper Res Soc, 53, 1367, 10.1057/palgrave.jors.2601454

Nekoiemehr, 2015, Scheduling of jobs with cross families in two stage manufacturing systems, Int J Prod Econ, 167, 88, 10.1016/j.ijpe.2015.05.022

Pranzo, 2004, Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times, Eur J Oper Res, 153, 581, 10.1016/S0377-2217(03)00264-9

Pan, 2012, An estimation of distribution algorithm for lot-streaming flow shop problems with setup times, Omega, 40, 166, 10.1016/j.omega.2011.05.002

Mohammadi, 2011, Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups, Expert Syst Appl, 38, 7201, 10.1016/j.eswa.2010.12.038

Wemmerlöv, 1991, Job and family scheduling of a flow-line manufacturing cell, IIE Trans, 23, 383, 10.1080/07408179108963871

Nawaz, 1983, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega, 11, 91, 10.1016/0305-0483(83)90088-9

Campbell, 1970, A heuristic algorithm for n jobs, m machine sequencing problem, Manag Sci, 16, 13630, 10.1287/mnsc.16.10.B630

Lu, 2013, Bi-criteria group scheduling with sequence-dependent setup time in a flow shop, J Oper Res Soc, 64, 530, 10.1057/jors.2012.61

Sabouni, 2013, Carryover sequence-dependent group scheduling with the integration of internal and external setup times, Eur J Oper Res, 224, 8, 10.1016/j.ejor.2012.07.013

Naderi, 2012, Permutation flowshops in group scheduling with sequence-dependent setup times, Eur J Ind Eng, 6, 177, 10.1504/EJIE.2012.045604

Salmasi, 2011, Makespan minimization of a flowshop sequence-dependent group scheduling problem, Int J Adv Manuf Technol, 56, 699, 10.1007/s00170-011-3206-9

Johnson, 1954, Optimal two- and three-stage production schedules with setup times included, Naval Res Logist, 1, 61, 10.1002/nav.3800010110

Bouabda, 2011, A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times, Comput Oper Res, 38, 387, 10.1016/j.cor.2010.06.006

Logendran, 2006, Sequence-dependent group scheduling problems in flexible flow shops, Int J Prod Econ, 102, 66, 10.1016/j.ijpe.2005.02.006

Solimanpur, 2013, A tabu search approach for cell scheduling problem with makespan criterion, Int J Prod Econ, 141, 639, 10.1016/j.ijpe.2012.10.001

Mosier, 1984, Analysis of group technology scheduling heuristics, Int J Prod Res, 22, 857, 10.1080/00207548408942505

Flynn, 1987, The effects of setup time on output capacity in cellular manufacturing, Int J Prod Res, 25, 1761

Mahmoodi, 1990, An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell, Int J Prod Res, 28, 1695, 10.1080/00207549008942824

Mahmoodi, 1990, An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system, J Oper Manag, 9, 548, 10.1016/0272-6963(90)90009-3

Ruben, 1993, A comprehensive analysis of group scheduling heuristics in a job shop cell, Int J Prod Res, 31, 1343, 10.1080/00207549308956795

Wirth, 1993, An investigation of scheduling policies in a dual-constrained manufacturing cell, Decis Sci, 24, 761, 10.1111/j.1540-5915.1993.tb00488.x

Kannan, 1994, Impact of family-based scheduling on transfer batches in a job shop manufacturing cell, Int J Prod Res, 32, 2777, 10.1080/00207549408957099

Ponnambalam, 1999, Analysis of group-scheduling heuristics in a manufacturing cell, Int J Adv Manuf Technol, 15, 914, 10.1007/s001700050149

Hitomi K, Nakamura N, Yoshida T, Okuda K. An experimental investigation of group production scheduling. In: Proceedings of the fourth international conference on production research; 1977. p. 608–17.

Russell, 1990, Sequencing rules and due date setting procedures in flow line cells with family setups, J Oper Manag, 10, 524, 10.1016/0272-6963(91)90009-M

Mahmoodi, 1992, Dynamic group scheduling heuristics in a flow-through cell environment, Decis Sci, 23, 61, 10.1111/j.1540-5915.1992.tb00377.x

Frazier, 1996, An evaluation of group scheduling heuristics in a flow-line manufacturing cell, Int J Prod Res, 34, 959, 10.1080/00207549608904945

Reddy, 2003, Heuristics and sequence-dependent set-up jobs in flow line cells, Int J Prod Res, 41, 193, 10.1080/00207540210163973

Yoshida, 1979, Optimal two-stage production scheduling with setup times separated, IIE Trans, 11, 261

Sekiguchi, 1983, Optimal schedule in a gt-type flow-shop under series-parallel precedence constraints, J Oper Res Soc Jpn, 26, 226, 10.15807/jorsj.26.226

Baker, 1990, Scheduling groups of jobs in the two-machine flow shop, Math Comput Model, 13, 29, 10.1016/0895-7177(90)90368-W

Yang, 2000, Two-machine flowshop group scheduling problem, Comput Oper Res, 27, 975, 10.1016/S0305-0548(99)00070-2

Wang, 2006, A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups, Comput Oper Res, 33, 1326, 10.1016/j.cor.2004.09.018

Bagchi, 2006, A review of tsp based approaches for flowshop scheduling, Eur J Oper Res, 169, 816, 10.1016/j.ejor.2004.06.040

Logendran R, Sriskandarajah C. Minimizing the total completion time in a two-machine group scheduling problem with carryover sequence dependency; 2001.

Logendran, 2003, Minimizing the mean flow time in a two-machine group-scheduling problem with carryover sequence dependency, Robot Comput Integr Manuf, 19, 21, 10.1016/S0736-5845(02)00059-5

Liou, 2010, 128

Sabouni, 2013, PCB assembly in a multi-machine flowshop with dynamic board release times, 1063

Sabouni, 2013, Genetic algorithm application in a dynamic PCB assembly with carryover sequence-dependent setups, Int J Mech Aerosp Ind Mechatron Manuf Eng, 7, 740

Logendran R, Sriskandarajah C. Scheduling methodology for hardware manufacturing systems. In: Proceedings of the NSF design, service, and manufacturing grantees and research conference, Birmingham, AL; 2003.

Petrov V. Flowline group production planning. London: Business Publications; 1968.

Allison, 1990, Combining Petrov׳s heuristic and the cds heuristic in group scheduling problems, Comput Ind Eng, 19, 457, 10.1016/0360-8352(90)90158-I

Logendran, 1995, Combined heuristics for bi-level group scheduling problems, Int J Prod Econ, 38, 133, 10.1016/0925-5273(94)00083-M

Vakharia, 1990, A simulated annealing approach to scheduling a manufacturing cell, Naval Res Logist, 37, 559, 10.1002/1520-6750(199008)37:4<559::AID-NAV3220370409>3.0.CO;2-8

Skorin-Kapov, 1993, Scheduling a flow-line manufacturing cell, Int J Prod Res, 31, 1721, 10.1080/00207549308956819

Sridhar, 1994, A genetic algorithm for family and job scheduling in a flowline-based manufacturing cell, Comput Ind Eng, 27, 469, 10.1016/0360-8352(94)90336-0

Schaller, 2001, A new lower bound for the flow shop group scheduling problem, Comput Ind Eng, 41, 151, 10.1016/S0360-8352(01)00049-3

Schaller, 2005, An improved branch and bound procedure for scheduling a flow line manufacturing cell, Int J Prod Res, 43, 4697, 10.1080/00207540500185216

Solimanpur, 2011, A tabu search approach for group scheduling in buffer-constrained flow shop cells, Int J Comput Integr Manuf, 24, 257, 10.1080/0951192X.2011.552527

Zolfaghari, 1999, Jointly solving the group scheduling and machining speed selection problems, Int J Prod Res, 37, 2377, 10.1080/002075499190815

Gupta, 2006, Minimizing flow time in a flow-line manufacturing cell with family setup times, J Oper Res Soc, 57, 163, 10.1057/palgrave.jors.2601971

Gupta, 1986, Flowshop schedules with sequence dependent setup times, J Oper Res Soc Jpn, 29, 206, 10.15807/jorsj.29.206

Neufeld, 2015, Minimizing makespan in flowshop group scheduling with sequence-dependent family setup times using inserted idle times, Int J Prod Res, 53, 1791, 10.1080/00207543.2014.961209

Eddaly M, Jarboui B, Bouabda R, Siarry P, Rebaï A. An estimation of distribution algorithm for solving flow shop scheduling problems with sequence-dependent family setup times. In: Metaheuristics for production scheduling, vol. 1. Wiley Online Library, Hoboken; 2013. p. 1–17.

Lin, 2009, Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times, Int J Prod Res, 47, 3205, 10.1080/00207540701813210

Ying, 2010, Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups, Int J Prod Res, 48, 2169, 10.1080/00207540802534707

Das, 2005, An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system, Int J Prod Econ, 97, 247, 10.1016/j.ijpe.2004.07.006

Salmasi, 2008, A heuristic approach for multi-stage sequence-dependent group scheduling problems, J Ind Eng Int Islam Azad Univ, 4, 48

Bouabda R, Jarboui B, Rebaï A. A nested iterated local search algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times. In: 2011 Fourth international conference on logistics (LOGISTIQUA). Hammamet: IEEE; 2011. p. 526–31.

Neufeld J. Group scheduling in flow-line manufacturing cells with variable neighborhood search. In: Dynamics and sustainability in international logistics and supply chain management: proceedings of the sixth German-Russian logistics and SCM workshop DR-LOG 2011 in Bremen; 2011. p. 274–84.

Ying, 2012, Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups, Int J Adv Manuf Technol, 58, 671, 10.1007/s00170-011-3419-y

Costa, 2013, A genetic algorithm for scheduling both job families and skilled workforce, Int J Oper Quant Manag, 19, 221

Costa, 2014, Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment, Int J Prod Res, 52, 2696, 10.1080/00207543.2014.883469

Li Y, Li X. Hybrid harmony search for the flowline manufacturing cell scheduling problem. In: Proceedings of the 2014 IEEE 18th international conference on computer supported cooperative work in design (CSCWD). Hsinchu: IEEE; 2014. p. 214–9.

Balaji, 2014, Artificial immune system algorithm and simulated annealing algorithm for scheduling batches of parts based on job availability model in a multi-cell flexible manufacturing system, Proc Eng, 97, 1524, 10.1016/j.proeng.2014.12.436

Nikjo, 2014, Meta heuristic for minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times, J Optim Ind Eng, 7, 21

Fichera S, Costa A, Cappadonna F. Scheduling jobs families with learning effect on the setup. Adv Oper Res 2015;2015:1–12.

Cho, 2003, A hybrid genetic algorithm for group scheduling with sequence dependent group setup time, Int J Ind Eng, 10, 442

Hajinejad, 2011, A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem, Sci Iran, 18, 759, 10.1016/j.scient.2011.05.023

Villadiego H, Arroyo J, Jacob V, dos Santos A, Goncalves L. An efficient ils heuristic for total flow time minimization in a flow shop sequence dependent group scheduling problem. In: 2012 12th International conference on hybrid intelligent systems (HIS). Pune: IEEE; 2012. p. 259–64.

Costa, 2014, A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem, Algorithms, 7, 376, 10.3390/a7030376

Ibrahem, 2014, Robust metaheuristics for scheduling cellular flowshop with family sequence-dependent setup times, Proc CIRP, 17, 428, 10.1016/j.procir.2014.01.072

Keshavarz, 2014, Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems, Eur J Ind Eng, 8, 366, 10.1504/EJIE.2014.060997

Hendizadeh, 2007, Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times, Eur J Ind Eng, 1, 391, 10.1504/EJIE.2007.015388

Taghavifard, 2011, Multi-objective group scheduling with learning effect in the cellular manufacturing system, Int J Ind Eng Comput, 2, 617

Lin, 2012, Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times, Eur J Ind Eng, 6, 474, 10.1504/EJIE.2012.047666

Stafford, 2002, Two models for a family of flowshop sequencing problems, Eur J Oper Res, 142, 282, 10.1016/S0377-2217(01)00320-4

Huang, 1998, A two-stage hybrid flowshop with uniform machines and setup times, Math Comput Model, 27, 27, 10.1016/S0895-7177(97)00258-6

Andres, 2005, Group technology in a hybrid flowshop environment, Eur J Oper Res, 167, 272, 10.1016/j.ejor.2004.03.026

Adressi, 2016, Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown, Decis Sci Lett, 5, 157, 10.5267/j.dsl.2015.7.001

Zandieh, 2011, An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times, J Intell Manuf, 22, 979, 10.1007/s10845-009-0374-7

Fadaei, 2013, Scheduling a bi-objective hybrid flow shop with sequence-dependent family setup times using metaheuristics, Arab J Sci Eng, 38, 2233, 10.1007/s13369-013-0611-4

Bozorgirad M, Logendran R. Developing tight lower bounds for hybrid flow shop scheduling problems. In: IIE annual conference proceedings. Montreal: Institute of industrial engineers; 2014. p. 341.

Tang, 2010, Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach, J Intell Manuf, 21, 525, 10.1007/s10845-008-0236-8

Elmi, 2011, A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts, Comput Ind Eng, 61, 171, 10.1016/j.cie.2011.03.007

Li, 2013, Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes, Comput Oper Res, 40, 1207, 10.1016/j.cor.2012.11.024

Yang, 1996, Group scheduling on two cells with intercell movement, Comput Oper Res, 23, 997, 10.1016/0305-0548(96)00003-2

Saravanan, 2008, A scatter search method to minimise makespan of cell scheduling problem, Int J Agile Syst Manag, 3, 18, 10.1504/IJASM.2008.019597

Tavakkoli-Moghaddam, 2008, A genetic algorithm and memetic algorithm to sequencing and scheduling of cellular manufacturing systems, Int J Manag Sci Eng Manag, 3, 119

Saravanan, 2009, Comparison of metaheuristic methods to minimize makespan of cell scheduling problems, Int J Des Manuf Technol, 3, 77, 10.18000/ijodam.70066

Mosbah A, Dao T-M. Optimimization of group scheduling using simulation with the meta-heuristic extended great deluge (EGD) approach. In: 2010 IEEE international conference on industrial engineering and engineering management (IEEM). Singapore: IEEE; 2010. p. 275–80.

Tavakkoli-Moghaddam, 2010, Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system, Expert Syst Appl, 37, 2661, 10.1016/j.eswa.2009.08.012

Taghavifard, 2012, Scheduling cellular manufacturing systems using aco and ga, Int J Appl Metaheuristic Comput, 3, 48, 10.4018/jamc.2012010105

Gholipour-Kanani, 2011, Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search, J Chin Inst Ind Eng, 28, 192

Gholipour-Kanani Y, Tavakkoli-Moghaddam R, Cheraghalizadeh R, Babol I, Mahmoodjanloo M. A new mathematical model for a multi-criteria group scheduling problem in a cms solved by a branch-and-bound method. In: Proceedings of the 2012 international conference on industrial engineering and operations management; 2012.