A comprehensive review of flowshop group scheduling literature
Tóm tắt
Từ khóa
Tài liệu tham khảo
Li, 2015, Solving the multi-objective flowline manufacturing cell scheduling problem by hybrid harmony search, Expert Syst Appl, 42, 1409, 10.1016/j.eswa.2014.09.007
Ham, 1985
Wu, 2009, Hybrid simulated annealing algorithm with mutation operator to the cell formation problem with alternative process routings, Expert Syst Appl, 36, 3652, 10.1016/j.eswa.2008.02.060
Snead, 1989
Askin, 1993, A comparison of scheduling philosophies for manufacturing cells, Eur J Oper Res, 69, 438, 10.1016/0377-2217(93)90027-K
Wu, 2007, Genetic algorithms for integrating cell formation with machine layout and scheduling, Comput Ind Eng, 53, 277, 10.1016/j.cie.2007.06.021
Akturk, 2011, Joint cell loading and scheduling approach to cellular manufacturing systems, Int J Prod Res, 49, 6321, 10.1080/00207543.2010.532165
Papaioannou, 2010, The evolution of cell formation problem methodologies based on recent studies (1997–2008), Eur J Oper Res, 206, 509, 10.1016/j.ejor.2009.10.020
Kia, 2012, Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing, Comput Oper Res, 39, 2642, 10.1016/j.cor.2012.01.012
Schaller, 2000, A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell, Int J Prod Res, 38, 287, 10.1080/002075400189419
Salmasi, 2010, Total flow time minimization in a flowshop sequence-dependent group scheduling problem, Comput Oper Res, 37, 199, 10.1016/j.cor.2009.04.013
Wilson, 2004, Scheduling non-similar groups on a flow line, Robot Comput Integr Manuf, 20, 505, 10.1016/j.rcim.2004.07.002
Lin, 2003, A case study in a two-stage hybrid flow shop with setup time and dedicated machines, Int J Prod Econ, 86, 133, 10.1016/S0925-5273(03)00011-2
Celano, 2010, Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times, Int J Adv Manuf Technol, 46, 695, 10.1007/s00170-009-2112-x
Li, 1997, A hybrid two-stage flowshop with part family, batch production, major and minor set-ups, Eur J Oper Res, 102, 142, 10.1016/S0377-2217(96)00213-5
van der Zee, 2013, Family based dispatching with batch availability, Int J Prod Res, 51, 3643, 10.1080/00207543.2012.756590
van der Zee, 2011, Family based dispatching in manufacturing networks, Int J ProdRes, 49, 7059, 10.1080/00207543.2010.537704
Schaller, 2000, Scheduling a flowline manufacturing cell with sequence dependent family setup times, Eur J Oper Res, 125, 324, 10.1016/S0377-2217(99)00387-2
Bozorgirad, 2015, A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics, Int J Adv Manuf Technol, 1
Gelogullari, 2010, Group-scheduling problems in electronics manufacturing, J Sched, 13, 177, 10.1007/s10951-009-0147-3
Yang, 2008, Multi-family scheduling in a two-machine reentrant flow shop with setups, Eur J Oper Res, 187, 1160, 10.1016/j.ejor.2006.06.065
MacCawley A. The international wine supply chain: challenges from bottling to the glass [Ph.D. thesis]. Georgia Institute of Technology; 2014.
Hitomi, 1976, Operations scheduling for group technology applications, Ann CIRP, 25, 419
Vaithianathan, 1982, On scheduling in a gt environment, J Manuf Syst, 1, 149, 10.1016/S0278-6125(82)80025-3
Mahmoodi, 1991, A comparison of exhaustive and non-exhaustive group scheduling heuristics in a manufacturing cell, Int J Prod Res, 29, 1923, 10.1080/00207549108948058
Allahverdi, 1999, A review of scheduling research involving setup considerations, Omega, 27, 219, 10.1016/S0305-0483(98)00042-5
Allahverdi, 2008, A survey of scheduling problems with setup times or costs, Eur J Oper Res, 187, 985, 10.1016/j.ejor.2006.06.060
Allahverdi, 2015, The third comprehensive survey on scheduling problems with setup times/costs, Eur J Oper Res, 246, 345, 10.1016/j.ejor.2015.04.004
Cheng, 2000, A review of flowshop scheduling research with setup times, Prod Oper Manag, 9, 262, 10.1111/j.1937-5956.2000.tb00137.x
Zhu, 2006, Scheduling and lot sizing with sequence-dependent setup, IIE Trans, 38, 987, 10.1080/07408170600559706
Filho, 2013, Scheduling in flow shop with sequence-dependent setup times, Int J Bus Innov Res, 7, 466, 10.1504/IJBIR.2013.054870
Logendran R. Group scheduling for cellular manufacturing systems. In: Group technology and cellular manufacturing, Methodologies and applications. New York: Gordon and Breach Science Publishers; 1998. p. 153–208.
Rajendran, 1994, A heuristic for scheduling in flowshop and flowline-based manufacturing cell with multi-criteria, Int J Prod Res, 32, 2541, 10.1080/00207549408957083
Hendizadeh, 2008, Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times, Int J Prod Econ, 111, 593, 10.1016/j.ijpe.2007.02.031
Eddaly M, Jarboui B, Bouabda R, Rebai A. Hybrid estimation of distribution algorithm for permutation flowshop scheduling problem with sequence dependent family setup times. In: International conference on computers & industrial engineering, 2009, CIE 2009. Troyes: IEEE; 2009. p. 217–20.
Cheng, 2011, Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times, Expert Syst Appl, 38, 15517, 10.1016/j.eswa.2011.06.008
Lin, 2011, Applying multi-start simulated annealing to schedule a flowline manufacturing cell with sequence dependent family setup times, Int J Prod Econ, 130, 246, 10.1016/j.ijpe.2011.01.004
Garey, 1976, The complexity of flowshop and jobshop scheduling, Math Oper Res, 1, 117, 10.1287/moor.1.2.117
Lenstra, 1977, Complexity of machine scheduling problems, Ann Discrete Math, 1, 343, 10.1016/S0167-5060(08)70743-X
Gupta, 1986, The two-machine sequence dependent flowshop scheduling problem, Eur J Oper Res, 24, 439, 10.1016/0377-2217(86)90037-8
Kleinau, 1993, Two-machine shop scheduling problems with batch processing, Math Comput Model, 17, 55, 10.1016/0895-7177(93)90196-6
Logendran, 2005, Group scheduling in flexible flow shops, Int J Prod Econ, 96, 143, 10.1016/j.ijpe.2004.03.011
Behnamian, 2010, Due windows group scheduling using an effective hybrid optimization approach, Int J Adv Manuf Technol, 46, 721, 10.1007/s00170-009-2147-z
Karimi, 2010, Bi-objective group scheduling in hybrid flexible flowshop, Expert Syst Appl, 37, 4024, 10.1016/j.eswa.2009.09.005
Wang, 2002, Locating cells with bottleneck machines in cellular manufacturing systems, Int J Prod Res, 40, 403, 10.1080/00207540110073109
Solimanpur, 2004, A heuristic to minimize makespan of cell scheduling problem, Int J Prod Econ, 88, 231, 10.1016/S0925-5273(03)00196-8
Graham, 1979, Optimization and approximation in deterministic sequencing and scheduling, Ann Discrete Math, 5, 287, 10.1016/S0167-5060(08)70356-X
Pinedo M. Scheduling—theory, algorithms and systems, 4th edition, vol. 2. New Jersey: Springer; 2012.
Ribas, 2010, Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective, Comput Oper Res, 37, 1439, 10.1016/j.cor.2009.11.001
Franca, 2005, Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups, Comput Ind Eng, 48, 491, 10.1016/j.cie.2003.11.004
Lin, 2009, Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times, Comput Oper Res, 36, 1110, 10.1016/j.cor.2007.12.010
Nikjo, 2014, A non-permutation flow shop manufacturing cell scheduling problem with part׳s sequence dependent family setup times, Int J Appl Metaheuristic Comput, 5, 70, 10.4018/ijamc.2014100104
Chen, 2013, Effect of solution representations on tabu search in scheduling applications,, Comput Oper Res, 40, 2817, 10.1016/j.cor.2013.06.003
Chen, 2013, A comparison of two chromosome representation schemes used in solving a family-based scheduling problem, Robot Comput-Integr Manuf, 29, 21, 10.1016/j.rcim.2012.04.009
Liou, 2013, A new encoding scheme-based hybrid algorithm for minimising two-machine flow-shop group scheduling problem, Int J Syst Sci, 44, 77, 10.1080/00207721.2011.581396
Liou, 2015, A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times, Int J Prod Econ, 170, 258, 10.1016/j.ijpe.2015.10.002
Logendran, 2006, Two-machine group scheduling problems in discrete 1020 parts manufacturing with sequence-dependent setups, Comput Oper Res, 33, 158, 10.1016/j.cor.2004.07.004
Shahvari, 2012, An efficient tabu search algorithm for flexible flow shop sequence-dependent group scheduling problems, Int J Prod Res, 50, 4237, 10.1080/00207543.2011.604051
Keshavarz, 2013, Makespan minimisation in flexible flowshop sequence-dependent group scheduling problem, Int J Prod Res, 51, 6182, 10.1080/00207543.2013.825055
Keshavarz, 2015, Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem, Ann Oper Res, 226, 351, 10.1007/s10479-014-1667-6
Norman, 1999, A genetic algorithm methodology for complex scheduling problems, Naval Res Logist, 46, 199, 10.1002/(SICI)1520-6750(199903)46:2<199::AID-NAV5>3.0.CO;2-L
Zandieh, 2009, Robust metaheuristics for group scheduling with sequence-dependent setup times in hybrid flexible flow shops, Int J Adv Manuf Technol, 43, 767, 10.1007/s00170-008-1740-x
Karimi, 2011, Group scheduling in flexible flow shops, Int J Prod Res, 49, 4965, 10.1080/00207543.2010.481644
Ebrahimi, 2014, Hybrid flow shop scheduling with sequence dependent family setup time and uncertain due dates, Appl Math Model, 38, 2490, 10.1016/j.apm.2013.10.061
Khamseh, 2015, Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops, Int J Adv Manuf Technol, 77, 173, 10.1007/s00170-014-6429-8
Bozorgirad, 2013, Bi-criteria group scheduling in hybrid flowshops, Int J Prod Econ, 145, 599, 10.1016/j.ijpe.2013.05.015
Radharamanan, 1986, A heuristic algorithm for group scheduling, Comput Ind Eng, 11, 204, 10.1016/0360-8352(86)90079-3
Logendran, 1991, Minimizing the makespan of a group scheduling problem, Int J Prod Econ, 22, 217, 10.1016/0925-5273(91)90098-E
Sridhar, 1996, Scheduling in flowshop and cellular manufacturing systems with multiple objectives a genetic algorithmic approach, Prod Plan Control, 7, 374, 10.1080/09537289608930365
Rajendran, 1999, Heuristics for scheduling in flowshops and flowline-based manufacturing cells to minimize the sum of weighted flowtime and weighted tardiness of jobs, Comput Ind Eng, 37, 671, 10.1016/S0360-8352(00)00003-6
Venkataramanaiah, 2008, Scheduling in cellular manufacturing systems, Int J Prod Res, 46, 429, 10.1080/00207540601138577
Henneberg, 2015, A constructive algorithm and a simulated annealing approach for solving flowshop problems with missing operations, Int J Prod Res, 1, 10.1080/00207543.2015.1082670
Cetinkaya, 1992, Unit sized transfer batch scheduling with setup times, Comput Ind Eng, 22, 177, 10.1016/0360-8352(92)90045-L
Logendran, 1993, Two-machine group scheduling problem with blocking and anticipatory setups, Eur J Oper Res, 69, 467, 10.1016/0377-2217(93)90029-M
Greene, 1986, Mixed integer program for loading and scheduling multiple flexible manufacturing cells, Eur J Oper Res, 24, 379, 10.1016/0377-2217(86)90031-7
Vickson, 1992, Two-and three-machine flow shop scheduling problems with equal sized transfer batches, Int J Prod Res, 30, 1551, 10.1080/00207549208948107
Sotskov, 1996, Heuristics for permutation flow shop scheduling with batch setup times, OR Spektr, 18, 67, 10.1007/BF01539731
Danneberg, 1999, A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size, Math Comput Model, 29, 101, 10.1016/S0895-7177(99)00085-0
Wang, 2005, Two-machine flowshop scheduling with job class setups to minimize total flowtime, Comput Oper Res, 32, 2751, 10.1016/j.cor.2004.04.002
Wang M-C, Rao Y-Q, Wang K-P. A niche genetic algorithm for two-machine flowshop scheduling with family sequence-dependent setup times and a common due window. In: 2010 IEEE international conference on industrial engineering and engineering management (IEEM). Singapore: IEEE; 2010. p. 296–300.
Schaller, 2012, Scheduling a permutation flow shop with family setups to minimise total tardiness, Int J Prod Res, 50, 2204, 10.1080/00207543.2011.575094
Pang, 2013, A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness, Int J Prod Econ, 141, 127, 10.1016/j.ijpe.2012.06.017
Shen, 2014, Flow shop batching and scheduling with sequence-dependent setup times, J Sched, 17, 353, 10.1007/s10951-014-0369-x
Yang, 2002, Group scheduling in a two-stage flowshop, J Oper Res Soc, 53, 1367, 10.1057/palgrave.jors.2601454
Nekoiemehr, 2015, Scheduling of jobs with cross families in two stage manufacturing systems, Int J Prod Econ, 167, 88, 10.1016/j.ijpe.2015.05.022
Pranzo, 2004, Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times, Eur J Oper Res, 153, 581, 10.1016/S0377-2217(03)00264-9
Pan, 2012, An estimation of distribution algorithm for lot-streaming flow shop problems with setup times, Omega, 40, 166, 10.1016/j.omega.2011.05.002
Mohammadi, 2011, Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups, Expert Syst Appl, 38, 7201, 10.1016/j.eswa.2010.12.038
Wemmerlöv, 1991, Job and family scheduling of a flow-line manufacturing cell, IIE Trans, 23, 383, 10.1080/07408179108963871
Nawaz, 1983, A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem, Omega, 11, 91, 10.1016/0305-0483(83)90088-9
Campbell, 1970, A heuristic algorithm for n jobs, m machine sequencing problem, Manag Sci, 16, 13630, 10.1287/mnsc.16.10.B630
Lu, 2013, Bi-criteria group scheduling with sequence-dependent setup time in a flow shop, J Oper Res Soc, 64, 530, 10.1057/jors.2012.61
Sabouni, 2013, Carryover sequence-dependent group scheduling with the integration of internal and external setup times, Eur J Oper Res, 224, 8, 10.1016/j.ejor.2012.07.013
Naderi, 2012, Permutation flowshops in group scheduling with sequence-dependent setup times, Eur J Ind Eng, 6, 177, 10.1504/EJIE.2012.045604
Salmasi, 2011, Makespan minimization of a flowshop sequence-dependent group scheduling problem, Int J Adv Manuf Technol, 56, 699, 10.1007/s00170-011-3206-9
Johnson, 1954, Optimal two- and three-stage production schedules with setup times included, Naval Res Logist, 1, 61, 10.1002/nav.3800010110
Bouabda, 2011, A branch and bound enhanced genetic algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times, Comput Oper Res, 38, 387, 10.1016/j.cor.2010.06.006
Logendran, 2006, Sequence-dependent group scheduling problems in flexible flow shops, Int J Prod Econ, 102, 66, 10.1016/j.ijpe.2005.02.006
Solimanpur, 2013, A tabu search approach for cell scheduling problem with makespan criterion, Int J Prod Econ, 141, 639, 10.1016/j.ijpe.2012.10.001
Mosier, 1984, Analysis of group technology scheduling heuristics, Int J Prod Res, 22, 857, 10.1080/00207548408942505
Flynn, 1987, The effects of setup time on output capacity in cellular manufacturing, Int J Prod Res, 25, 1761
Mahmoodi, 1990, An investigation of dynamic group scheduling heuristics in a job shop manufacturing cell, Int J Prod Res, 28, 1695, 10.1080/00207549008942824
Mahmoodi, 1990, An evaluation of order releasing and due date assignment heuristics in a cellular manufacturing system, J Oper Manag, 9, 548, 10.1016/0272-6963(90)90009-3
Ruben, 1993, A comprehensive analysis of group scheduling heuristics in a job shop cell, Int J Prod Res, 31, 1343, 10.1080/00207549308956795
Wirth, 1993, An investigation of scheduling policies in a dual-constrained manufacturing cell, Decis Sci, 24, 761, 10.1111/j.1540-5915.1993.tb00488.x
Kannan, 1994, Impact of family-based scheduling on transfer batches in a job shop manufacturing cell, Int J Prod Res, 32, 2777, 10.1080/00207549408957099
Ponnambalam, 1999, Analysis of group-scheduling heuristics in a manufacturing cell, Int J Adv Manuf Technol, 15, 914, 10.1007/s001700050149
Hitomi K, Nakamura N, Yoshida T, Okuda K. An experimental investigation of group production scheduling. In: Proceedings of the fourth international conference on production research; 1977. p. 608–17.
Russell, 1990, Sequencing rules and due date setting procedures in flow line cells with family setups, J Oper Manag, 10, 524, 10.1016/0272-6963(91)90009-M
Mahmoodi, 1992, Dynamic group scheduling heuristics in a flow-through cell environment, Decis Sci, 23, 61, 10.1111/j.1540-5915.1992.tb00377.x
Frazier, 1996, An evaluation of group scheduling heuristics in a flow-line manufacturing cell, Int J Prod Res, 34, 959, 10.1080/00207549608904945
Reddy, 2003, Heuristics and sequence-dependent set-up jobs in flow line cells, Int J Prod Res, 41, 193, 10.1080/00207540210163973
Yoshida, 1979, Optimal two-stage production scheduling with setup times separated, IIE Trans, 11, 261
Sekiguchi, 1983, Optimal schedule in a gt-type flow-shop under series-parallel precedence constraints, J Oper Res Soc Jpn, 26, 226, 10.15807/jorsj.26.226
Baker, 1990, Scheduling groups of jobs in the two-machine flow shop, Math Comput Model, 13, 29, 10.1016/0895-7177(90)90368-W
Yang, 2000, Two-machine flowshop group scheduling problem, Comput Oper Res, 27, 975, 10.1016/S0305-0548(99)00070-2
Wang, 2006, A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setups, Comput Oper Res, 33, 1326, 10.1016/j.cor.2004.09.018
Bagchi, 2006, A review of tsp based approaches for flowshop scheduling, Eur J Oper Res, 169, 816, 10.1016/j.ejor.2004.06.040
Logendran R, Sriskandarajah C. Minimizing the total completion time in a two-machine group scheduling problem with carryover sequence dependency; 2001.
Logendran, 2003, Minimizing the mean flow time in a two-machine group-scheduling problem with carryover sequence dependency, Robot Comput Integr Manuf, 19, 21, 10.1016/S0736-5845(02)00059-5
Liou, 2010, 128
Sabouni, 2013, PCB assembly in a multi-machine flowshop with dynamic board release times, 1063
Sabouni, 2013, Genetic algorithm application in a dynamic PCB assembly with carryover sequence-dependent setups, Int J Mech Aerosp Ind Mechatron Manuf Eng, 7, 740
Logendran R, Sriskandarajah C. Scheduling methodology for hardware manufacturing systems. In: Proceedings of the NSF design, service, and manufacturing grantees and research conference, Birmingham, AL; 2003.
Petrov V. Flowline group production planning. London: Business Publications; 1968.
Allison, 1990, Combining Petrov׳s heuristic and the cds heuristic in group scheduling problems, Comput Ind Eng, 19, 457, 10.1016/0360-8352(90)90158-I
Logendran, 1995, Combined heuristics for bi-level group scheduling problems, Int J Prod Econ, 38, 133, 10.1016/0925-5273(94)00083-M
Vakharia, 1990, A simulated annealing approach to scheduling a manufacturing cell, Naval Res Logist, 37, 559, 10.1002/1520-6750(199008)37:4<559::AID-NAV3220370409>3.0.CO;2-8
Skorin-Kapov, 1993, Scheduling a flow-line manufacturing cell, Int J Prod Res, 31, 1721, 10.1080/00207549308956819
Sridhar, 1994, A genetic algorithm for family and job scheduling in a flowline-based manufacturing cell, Comput Ind Eng, 27, 469, 10.1016/0360-8352(94)90336-0
Schaller, 2001, A new lower bound for the flow shop group scheduling problem, Comput Ind Eng, 41, 151, 10.1016/S0360-8352(01)00049-3
Schaller, 2005, An improved branch and bound procedure for scheduling a flow line manufacturing cell, Int J Prod Res, 43, 4697, 10.1080/00207540500185216
Solimanpur, 2011, A tabu search approach for group scheduling in buffer-constrained flow shop cells, Int J Comput Integr Manuf, 24, 257, 10.1080/0951192X.2011.552527
Zolfaghari, 1999, Jointly solving the group scheduling and machining speed selection problems, Int J Prod Res, 37, 2377, 10.1080/002075499190815
Gupta, 2006, Minimizing flow time in a flow-line manufacturing cell with family setup times, J Oper Res Soc, 57, 163, 10.1057/palgrave.jors.2601971
Gupta, 1986, Flowshop schedules with sequence dependent setup times, J Oper Res Soc Jpn, 29, 206, 10.15807/jorsj.29.206
Neufeld, 2015, Minimizing makespan in flowshop group scheduling with sequence-dependent family setup times using inserted idle times, Int J Prod Res, 53, 1791, 10.1080/00207543.2014.961209
Eddaly M, Jarboui B, Bouabda R, Siarry P, Rebaï A. An estimation of distribution algorithm for solving flow shop scheduling problems with sequence-dependent family setup times. In: Metaheuristics for production scheduling, vol. 1. Wiley Online Library, Hoboken; 2013. p. 1–17.
Lin, 2009, Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times, Int J Prod Res, 47, 3205, 10.1080/00207540701813210
Ying, 2010, Permutation and non-permutation schedules for the flowline manufacturing cell with sequence dependent family setups, Int J Prod Res, 48, 2169, 10.1080/00207540802534707
Das, 2005, An algorithm for scheduling batches of parts in a multi-cell flexible manufacturing system, Int J Prod Econ, 97, 247, 10.1016/j.ijpe.2004.07.006
Salmasi, 2008, A heuristic approach for multi-stage sequence-dependent group scheduling problems, J Ind Eng Int Islam Azad Univ, 4, 48
Bouabda R, Jarboui B, Rebaï A. A nested iterated local search algorithm for scheduling a flowline manufacturing cell with sequence dependent family setup times. In: 2011 Fourth international conference on logistics (LOGISTIQUA). Hammamet: IEEE; 2011. p. 526–31.
Neufeld J. Group scheduling in flow-line manufacturing cells with variable neighborhood search. In: Dynamics and sustainability in international logistics and supply chain management: proceedings of the sixth German-Russian logistics and SCM workshop DR-LOG 2011 in Bremen; 2011. p. 274–84.
Ying, 2012, Metaheuristics for scheduling a no-wait flowshop manufacturing cell with sequence-dependent family setups, Int J Adv Manuf Technol, 58, 671, 10.1007/s00170-011-3419-y
Costa, 2013, A genetic algorithm for scheduling both job families and skilled workforce, Int J Oper Quant Manag, 19, 221
Costa, 2014, Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment, Int J Prod Res, 52, 2696, 10.1080/00207543.2014.883469
Li Y, Li X. Hybrid harmony search for the flowline manufacturing cell scheduling problem. In: Proceedings of the 2014 IEEE 18th international conference on computer supported cooperative work in design (CSCWD). Hsinchu: IEEE; 2014. p. 214–9.
Balaji, 2014, Artificial immune system algorithm and simulated annealing algorithm for scheduling batches of parts based on job availability model in a multi-cell flexible manufacturing system, Proc Eng, 97, 1524, 10.1016/j.proeng.2014.12.436
Nikjo, 2014, Meta heuristic for minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times, J Optim Ind Eng, 7, 21
Fichera S, Costa A, Cappadonna F. Scheduling jobs families with learning effect on the setup. Adv Oper Res 2015;2015:1–12.
Cho, 2003, A hybrid genetic algorithm for group scheduling with sequence dependent group setup time, Int J Ind Eng, 10, 442
Hajinejad, 2011, A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem, Sci Iran, 18, 759, 10.1016/j.scient.2011.05.023
Villadiego H, Arroyo J, Jacob V, dos Santos A, Goncalves L. An efficient ils heuristic for total flow time minimization in a flow shop sequence dependent group scheduling problem. In: 2012 12th International conference on hybrid intelligent systems (HIS). Pune: IEEE; 2012. p. 259–64.
Costa, 2014, A hybrid metaheuristic approach for minimizing the total flow time in a flow shop sequence dependent group scheduling problem, Algorithms, 7, 376, 10.3390/a7030376
Ibrahem, 2014, Robust metaheuristics for scheduling cellular flowshop with family sequence-dependent setup times, Proc CIRP, 17, 428, 10.1016/j.procir.2014.01.072
Keshavarz, 2014, Efficient upper and lower bounding methods for flowshop sequence-dependent group scheduling problems, Eur J Ind Eng, 8, 366, 10.1504/EJIE.2014.060997
Hendizadeh, 2007, Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times, Eur J Ind Eng, 1, 391, 10.1504/EJIE.2007.015388
Taghavifard, 2011, Multi-objective group scheduling with learning effect in the cellular manufacturing system, Int J Ind Eng Comput, 2, 617
Lin, 2012, Scheduling a bi-criteria flowshop manufacturing cell with sequence-dependent family setup times, Eur J Ind Eng, 6, 474, 10.1504/EJIE.2012.047666
Stafford, 2002, Two models for a family of flowshop sequencing problems, Eur J Oper Res, 142, 282, 10.1016/S0377-2217(01)00320-4
Huang, 1998, A two-stage hybrid flowshop with uniform machines and setup times, Math Comput Model, 27, 27, 10.1016/S0895-7177(97)00258-6
Andres, 2005, Group technology in a hybrid flowshop environment, Eur J Oper Res, 167, 272, 10.1016/j.ejor.2004.03.026
Adressi, 2016, Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown, Decis Sci Lett, 5, 157, 10.5267/j.dsl.2015.7.001
Zandieh, 2011, An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times, J Intell Manuf, 22, 979, 10.1007/s10845-009-0374-7
Fadaei, 2013, Scheduling a bi-objective hybrid flow shop with sequence-dependent family setup times using metaheuristics, Arab J Sci Eng, 38, 2233, 10.1007/s13369-013-0611-4
Bozorgirad M, Logendran R. Developing tight lower bounds for hybrid flow shop scheduling problems. In: IIE annual conference proceedings. Montreal: Institute of industrial engineers; 2014. p. 341.
Tang, 2010, Optimization of parts scheduling in multiple cells considering intercell move using scatter search approach, J Intell Manuf, 21, 525, 10.1007/s10845-008-0236-8
Elmi, 2011, A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts, Comput Ind Eng, 61, 171, 10.1016/j.cie.2011.03.007
Li, 2013, Dynamic parts scheduling in multiple job shop cells considering intercell moves and flexible routes, Comput Oper Res, 40, 1207, 10.1016/j.cor.2012.11.024
Yang, 1996, Group scheduling on two cells with intercell movement, Comput Oper Res, 23, 997, 10.1016/0305-0548(96)00003-2
Saravanan, 2008, A scatter search method to minimise makespan of cell scheduling problem, Int J Agile Syst Manag, 3, 18, 10.1504/IJASM.2008.019597
Tavakkoli-Moghaddam, 2008, A genetic algorithm and memetic algorithm to sequencing and scheduling of cellular manufacturing systems, Int J Manag Sci Eng Manag, 3, 119
Saravanan, 2009, Comparison of metaheuristic methods to minimize makespan of cell scheduling problems, Int J Des Manuf Technol, 3, 77, 10.18000/ijodam.70066
Mosbah A, Dao T-M. Optimimization of group scheduling using simulation with the meta-heuristic extended great deluge (EGD) approach. In: 2010 IEEE international conference on industrial engineering and engineering management (IEEM). Singapore: IEEE; 2010. p. 275–80.
Tavakkoli-Moghaddam, 2010, Design of a scatter search method for a novel multi-criteria group scheduling problem in a cellular manufacturing system, Expert Syst Appl, 37, 2661, 10.1016/j.eswa.2009.08.012
Taghavifard, 2012, Scheduling cellular manufacturing systems using aco and ga, Int J Appl Metaheuristic Comput, 3, 48, 10.4018/jamc.2012010105
Gholipour-Kanani, 2011, Solving a multi-criteria group scheduling problem for a cellular manufacturing system by scatter search, J Chin Inst Ind Eng, 28, 192
Gholipour-Kanani Y, Tavakkoli-Moghaddam R, Cheraghalizadeh R, Babol I, Mahmoodjanloo M. A new mathematical model for a multi-criteria group scheduling problem in a cms solved by a branch-and-bound method. In: Proceedings of the 2012 international conference on industrial engineering and operations management; 2012.