Two-machine flowshop scheduling with availability constraints

European Journal of Operational Research - Tập 114 - Trang 420-429 - 1999
Chung-Yee Lee1
1Department of Industrial Engineering, 238 Zachry Building, Texas A&M University, College Station, TX 77843-3131, USA

Tài liệu tham khảo

Adiri, 1989, Single machine flow-time scheduling with a single breakdown, Acta Informatica, 26, 679, 10.1007/BF00288977 Baker, K., 1995. Elements of Sequencing and Scheduling. Amons Tuck School, Hanover, NH Dudek, 1992, The lessons of flowshop scheduling research, Operations Research, 40, 7, 10.1287/opre.40.1.7 Garey, 1976, The complexity of flowshop and jobshop scheduling, Mathematics of Operations Research, 1, 117, 10.1287/moor.1.2.117 Hall, 1994, A polynomial approximation scheme for a constrained flowshop scheduling problem, Mathematics of Operations Research, 19, 68, 10.1287/moor.19.1.68 Johnson, 1954, Optimal two- and three-stage production schedules with setup times included, Naval Research Logistics Quarterly, 1, 61, 10.1002/nav.3800010110 Lee, 1991, Parallel machines scheduling with non-simultaneous machine available time, Discrete Applied Mathematics, 30, 53, 10.1016/0166-218X(91)90013-M Lee, C.-Y., 1996. Machine scheduling with an availability constraint (special issue on Optimization on Scheduling Applications). Journal of Global Optimization 9, 395–416 Lee, 1997, Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint, Operations Research Letters, 20, 129, 10.1016/S0167-6377(96)00041-7 Lee, 1993, Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem, Management Science, 39, 616, 10.1287/mnsc.39.5.616 Lee, 1992, Single machine flow-time scheduling with scheduled maintenance, Acta Informatica, 29, 375, 10.1007/BF01178778 Lee, 1993, Capacitated two-parallel machines scheduling to minimize sum of job completion times, Discrete Applied Mathematics, 41, 211, 10.1016/0166-218X(90)90055-H Lee, 1997, Current trend in deterministic scheduling, Annals of Operations Research, 70, 1, 10.1023/A:1018909801944 Lee, 1994, Minimizing makespan in hybrid flowshops, Operations Research Letters, 16, 149, 10.1016/0167-6377(94)90026-4 Mosheiov, 1994, Minimizing the sum of job completion times on capacitated parallel machines, Mathematical and Computer Modelling, 20, 91, 10.1016/0895-7177(94)90024-8 Pinedo, M.L., 1995. Scheduling: Theory, Algorithms and Systems. Prentice-Hall, Englewood Cliffs, NJ Schmidt, 1984, Scheduling on semi-identical processors, Zeitschrift fur Operations Research, 28, 153, 10.1007/BF01920917 Schmidt, 1988, Scheduling independent tasks with deadlines on semi-identical processors, Journal of Operational Research Society, 39, 271, 10.1057/jors.1988.44