Application study on the first cable-stayed bridge with CFRP cables in China
Tài liệu tham khảo
ACI, 2004
Benmokrane, 1997, Aramid and carbon fibre-reinforced plastic prestressed ground anchors and their field applications, Canadian Journal of Civil Engineering, 24, 968
Benmokrane, 2000, Tensile properties and pullout behaviour of AFRP and CFRP rods for grouted anchor applications, Construction and Building Materials, 14, 157, 10.1016/S0950-0618(00)00017-9
Fang, 2012, Behaviors of super-long span prestressed cable-stayed bridge with CFRP cables and UHPC girder, Engineering Sciences, 14, 53
Fang, 2013, Experimental investigation of a bond-type anchorage system for multiple FRP tendons, Engineering Structures, 57, 364, 10.1016/j.engstruct.2013.09.038
Jung, 2013, A fundamental study on the anchor performance of non-surface treated multi CFRP tendons, International Journal of Civil, Structural, Construction and Architectural Engineering, 7, 536
Li, 1990, Suggestion of constructing CFRP bridge at the narrowest point of Gibraltar Strait, World Bridges, 45
Mei, 2005
Mei, 2007, Analysis of static behavior of cable-stayed bridge used with CFRP cables and with span length greater than 1000 meters, World Bridges, 47
Mei, 2004, Static characteristic analysis of CFRP cable, China Journal of Highway and Transport, 17, 43
Mei, 2006, Dynamic characteristics analysis of cable-stayed bridge with CFRP cables, Highway, 48
Mei, 2007, Property of nonlinear parametric vibration of CFRP cables, China Journal of Highway and Transport, 20, 52
Mei, 2005, Study of static load tests of CFRP stay cable anchors, Bridge Construction, 20
Mei, 2007, Study on the design and test of the cable-stayed bridge with CFRP cable, Journal of Chang’an University: Natural Science Edition, 27, 48
Noisternig, 2000, Carbon fibre composites as stay cables for bridges, Applied Composite Materials, 7, 139, 10.1023/A:1008946132034
Scalea, 2000, I-5/Gilman advanced technology bridge project
Schmidt, 2010, Development of mechanical anchor for CFRP tendons using integrated sleeve, Journal of Composites for Construction, 14, 397, 10.1061/(ASCE)CC.1943-5614.0000096
Schmidt, 2012, Mechanical anchorage of FRP tendons – a literature review, Construction & Building Materials, 32, 110, 10.1016/j.conbuildmat.2011.11.049
Swiatecki, 1998, Building better bridges with CFRP, Reinforced Plastics, 42, 44, 10.1016/S0034-3617(97)86175-9
Wang, 2010, Evaluation of FRP and hybrid FRP cables for super long-span cable-stayed bridges, Composite Structures, 92, 2582, 10.1016/j.compstruct.2010.01.023
Winkler, 1998, Carbon fiber products (CFP) – a construction material for the next century
Xie, 2014, Static and dynamic characteristics of a long-span cable-stayed bridge with CFRP cables, Materials, 7, 4854, 10.3390/ma7064854
Xiong, 2012, Design of cable-stayed bridges with CFRP-steel composite stay cables based on mechanical and economical behaviors, China Journal of Highway and Transport, 25, 97
Zhang, 2002, Pullout bond properties of fiber-reinforced polymer tendons to grout, Journal of Materials in Civil Engineering, 14, 399, 10.1061/(ASCE)0899-1561(2002)14:5(399)
Zhang, 2001, Tensile behavior of FRP tendons for prestressed ground anchors, Journal of Composites for Construction, 5, 85, 10.1061/(ASCE)1090-0268(2001)5:2(85)
Zhang, 2006, Design and evaluation of fiber-reinforced polymer bond-type anchorages and ground anchors, International Journal of Geomechanics, 6, 166, 10.1061/(ASCE)1532-3641(2006)6:3(166)
Zhang, 2009, Nonlinear vibration of steel and CFRP cables of long span cable-stayed bridge under vehicular loads, Engineering Mechanics, 26, 123, 10.3901/JME.2004.08.123
Zhang, 2007, Aerodynamic stability of cable-supported bridges using CFRP cables, Journal of Zhejiang University-Science A: Applied Physics & Engineering, 8, 693, 10.1631/jzus.2007.A0693
Zhou, 2011, Nonlinear seismic response control analysis of long-span cable-stayed bridge with CFRP cables, Journal of Highway and Transport, 24, 64