A strategy for the integration of production planning and reactive scheduling in the optimization of a hydrogen supply network
Tài liệu tham khảo
Balas, 1985, Disjunctive programming and a hierarchy of relaxations for discrete optimization problems, SIAM J. Alg. Disc. Meth, 6, 466, 10.1137/0606047
Bassett, 1996, Perspectives on model based integration of process operations, Comput. Chem. Engng, 20, 821, 10.1016/0098-1354(95)00184-0
Birewar, 1990, Simultaneous production planning and scheduling of multiproduct batch plants, Ind. Eng. Chem. Res, 29, 570, 10.1021/ie00100a013
Bose, 2000, A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain, Comput. Chem. Eng, 24, 329, 10.1016/S0098-1354(00)00469-5
Brooke, 1992
Bullard, L.G., Iterated linear programming strategies for constrained and nonsmooth simulation, Ph.D. Dissertation, Carnegie Mellon University, 1991.
Bullard, 1992, Iterated linear programming strategies for nonsmooth simulation: continuous and mixed-integer approaches, Comput. Chem. Eng, 16, 949, 10.1016/0098-1354(92)80029-9
Coxhead, 1994, Integrated planning and scheduling systems for the refining industry, 185
Das, 2000, An investigation on integration of aggregate production planning, master production scheduling and short-term production scheduling of batch process operations through a common data model, Comput. Chem. Eng, 24, 1625, 10.1016/S0098-1354(00)80014-9
Dimitriadis, 1997, RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants, Comput. Chem. Eng, S21, S1061, 10.1016/S0098-1354(97)87643-0
Drud, 1994, CONOPT—a large scale GRG code, ORSA J. Comput, 6, 207, 10.1287/ijoc.6.2.207
Duran, 1986, A mixed-integer nonlinear programming algorithm for process systems synthesis, AIChE J, 32, 10.1002/aic.690320408
Fisher, 1981, The Lagrangean relaxation method for solving integer programming problems, Manage. Sci, 27, 10.1287/mnsc.27.1.1
Fisher, 1985, An applications oriented guide to Lagrangean relaxation, Interfaces, 15, 10, 10.1287/inte.15.2.10
Guignard, 1987, Lagrangean decomposition: a model yielding stronger Lagrangean bounds, Math. Prog, 39, 215, 10.1007/BF02592954
Grossmann, I.E., Van den Heever, S.A., Harjunkoski, I., ‘Discrete Optimization Methods and their Role in the Integration of Planning and Scheduling,’ AIChE Symposium Series No 326, Vol. 98 pp. 150–168 (2002).
ILOG CPLEX 7.0, User's Manual, ILOG Inc., 2001.
Lasschuit, W., Thijssen, N., Supporting Supply Chain Planning And Scheduling Decisions in the Oil and Chemical Industry, Proceedings FOCAPO 2003 (Eds. I.E. Grossmann and C.M. McDonald), pp. 37–44, CACHE.
Marques, 1988, On-line optimization of gas pipeline networks, Automatica, 24, 455, 10.1016/0005-1098(88)90091-X
Martinez-Benet, 1988, A powerful improvement on the methodology for solving large-scale pipeline networks, Comput. Chem. Eng, 12, 261, 10.1016/0098-1354(88)85037-3
Neiro, S.M.S., Pinto, J.M. Supply Chain Optimization of Petroleum Refinery Complexes, Proceedings FOCAPO 2003 (Eds. I.E. Grossmann and C.M. McDonald), pp. 59–72, CACHE.
Papageorgiou, 1996, Optimal campaign planning/scheduling of multipurpose batch/semi-continuous plants, 1. Mathematical formulations, Ind. Eng. Chem. Res, 35, 488, 10.1021/ie950081l
Papageorgiou, 1996, Optimal campaign planning/scheduling of multipurpose batch/semi-continuous plants, 2. A mathematical decomposition approach, Ind. Eng. Chem. Res, 35, 510, 10.1021/ie950082d
Petkov, 1997, Multiperiod planning and scheduling of multiproduct batch plants under demand uncertainty, Ind. Eng. Chem. Res, 36, 4864, 10.1021/ie970259z
Rodrigues, 2000, Short-term planning and scheduling in multipurpose batch chemical plants: a multi-level approach, Comput. Chem. Eng, 24, 2247, 10.1016/S0098-1354(00)00570-6
Sahinidis, 1992, Reformulation of the multiperiod MILP model for capacity expansion of chemical processes, Operat. Res, 40, S127, 10.1287/opre.40.1.S127
Sand, 2000, Approximation of an ideal online scheduler for a multiproduct batch plant, Comput. Chem. Eng, 24, 361, 10.1016/S0098-1354(00)00473-7
Shah, 1998, Single- and multisite planning and scheduling: current status and future challenges, AICHE Symp. Ser. No. 320, 94, 75
Shobrys, 2000, Planning, scheduling and control systems: why can they not work together, Comput. Chem. Eng, 24, 163, 10.1016/S0098-1354(00)00508-1
Sood, 1971, Dynamic optimization of a natural gas pipeline using a gradient search technique, Int. J. Contr, 14, 1149, 10.1080/00207177108932121
Sun, 1999, An integrated expert system/operations research approach for natural gas pipeline operations optimization, IEEE Can. Conf. Electr. Comput. Eng. Proc, 2, 114
Türkay, 1996, Logic-based MINLP algorithms for the optimal synthesis of process networks, Comput. Chem. Eng, 28, 959, 10.1016/0098-1354(95)00219-7
Türkay, 1998, Tight mixed-integer optimization models for the solution of linear and nonlinear systems of disjunctive equations, Comput. Chem. Eng, 22, 1229, 10.1016/S0098-1354(98)00026-X
Van den Heever, 2001, A Lagrangean decomposition heuristic for the design and planning of offshore hydrocarbon field infrastructures with complex economic objectives, Ind. Eng. Chem. Res, 40, 2857, 10.1021/ie000755e
Viswanathan, 1990, A combined penalty function and outer-approximation method for MINLP optimization, Comput. Chem. Eng, 14, 769, 10.1016/0098-1354(90)87085-4
Wong, 1968, Optimization of natural-gas pipelines systems via dynamic programming, IEEE. Trans. Auto. Contr, AC-13, 475, 10.1109/TAC.1968.1098990