Design and manufacture of the Toroidal Pump Limiter-start up version for the CIEL project
Proceedings of the 19th IEEE/IPSS Symposium on Fusion Engineering. 19th SOFE (Cat. No.02CH37231) - Trang 348-351
Tóm tắt
After a one year shutdown devoted to the installation of Tore Supra new components (CIEL project) and the associated diagnostics, the first experimental campaign is mainly dedicated to the qualification of these high heat flux components and the general commissioning of the machine. Because of the delay of delivery of the high flux components (so-called fingers) and in order to enable the qualification of CIEL main components, a start version of the Tore Supra/CIEL Toroidal Pump Limiter (TPL) has been designed and manufactured.
Từ khóa
#Manufacturing #Fingers #Toroidal magnetic fields #Magnetic field measurement #Qualifications #Protection #Plasma measurements #Insulation #Delay #PumpsTài liệu tham khảo
10.1016/S0920-3796(01)00317-9
10.1016/S0920-3796(00)00393-8
lipa, 1997, Towards long pulse high performance discharges in TORE SUPRA: upgrading of inner vessel components (CIEL PROJECT), Proceedings of the 17thSOFE, 1, 353
10.1016/S0920-3796(00)00346-X