WITHDRAWN: Staged premium screen completion design for horizontal well based on laboratory test: A successful application in block 451, Shengli Oil Field

Petroleum - 2018
Chen Yang1, Wang Shaoxian1, Chen Zongyi2, Yang Haibo1, Zhang Jianguo1, Qi Zhigang1
1Drilling Technology Research Institute, Shengli Petroleum Engineering Corporation Limited, SINOPEC, Dongying, China
2Research Institute of Petroleum Engineering Technology, Shengli Oilfield Company, SINOPEC, Dongying, China

Tài liệu tham khảo

Youming, 2009, New-type horizontal well completion method of delaying and controlling bottom water coning, J. Southwest Pet. Univ.: Sci. Technol. Ed., 31, 103 Ouyang, 2009, Practical consideration of an inflow-control device application for reducing water production Youming, 2011, Well equalizing flowing completion technology to delay and control botton water coning in horizontal well, Pet. Drill. Tech., 39, 66 Dean, 2013, Optimization design of the rundle liner completed horizontal wells in the Honghe oilfield, J. Chongqing Univ. Sci. Technol. (Natural Sci. Ed.), 15, 85 Lin, 2016, The multi-pronged approach to stabilize production and control water cut in Panyu oil field, Chem. Eng. Design Commun., 42, 23 Jinzhong, 2011, Research and application of the staged flow-regulating and water-control technology with screen or tubing in horizontal holes, China Petroleum Machinery, 39, 60 Xu, 2011, The Research for delaying the bottom water coning in horizontal wells application step screen pipe, Sci. Technol. Eng., 26, 6298 Shan, 2013, The Research for delaying the bottom water coning in horizontal wells application balance screen pipe, Adv. Mater. Res., 734, 1480, 10.4028/www.scientific.net/AMR.734-737.1480 Chanpura, 2011, advancements in screen testing, interpretation and modeling for standalone screen applications Chanpura, 2012, Modeling of square mesh screens in slurry test conditions for standalone screen applications Lee, 2013, Laboratory test to evaluate the performance of sand control screens during hydrate dissociation process by depressurization Procyk, 2015, Sand control screen erosion: prediction and avoidance Yang, 2016, A new test apparatus for evaluating premium screen performance, Adv. Petrol. Explor. Dev., 11, 30 Al Marzouqi, 2010, Wellbore segmentation using inflow control devices: design & optimization process Karim, 2010, Horizontal well optimization with inflow control devices (ICDs) application in heterogeneous and dipping gas-capped oil reservoirs Minulina, 2012, The design, implementation and use of inflow control devices for improving the production performance of horizontal wells Yang, 2014, Design of static flow control parameters for equilibrium fluid supply completion of horizontal wells, Oil drilling & production technology, 36, 45 Van der Bol, 2016, ICD design optimisation with single-well dynamic 3D modelling and real-time operation support