A possibilistic programming approach for closed-loop supply chain network design under uncertainty

Fuzzy Sets and Systems - Tập 161 - Trang 2668-2683 - 2010
M.S. Pishvaee, S.A. Torabi1
1Department of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran

Tài liệu tham khảo

Dullaert, 2007, Supply chain (re)design: support for managerial and policy decisions, European Journal of Transport and Infrastructure Research, 7, 73 Meade, 2007, The theory and practice of reverse logistics, International Journal of Logistics Systems and Management, 3, 56, 10.1504/IJLSM.2007.012070 Petek, 1996, An integral approach to waste minimization in process industries, Resource, Conservation and Recycling, 17, 169, 10.1016/0921-3449(96)01151-2 Fleischmann, 2004, Reverse logistics network design, 65 Üster, 2007, Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model, Naval Research Logistics, 54, 890, 10.1002/nav.20262 Krikke, 1999, Reverse logistic network re-design for copiers, OR Spektrum, 21, 381, 10.1007/s002910050095 Ko, 2007, A genetic-based heuristic for the dynamic integrated forward/reverse logistics network for 3PLs, Computers & Operations Research, 34, 346, 10.1016/j.cor.2005.03.004 Du, 2008, A bi-objective reverse logistics network analysis for post-sale service, Computers & Operations Research, 35, 2617, 10.1016/j.cor.2006.12.020 Jayaraman, 2003, The design of reverse distribution networks: models and solution procedures, European Journal of Operational Research, 150, 128, 10.1016/S0377-2217(02)00497-6 Min, 2006, The spatial and temporal consolidation of returned products in a closed-loop supply chain network, Computers & Industrial Engineering, 51, 309, 10.1016/j.cie.2006.02.010 Pishvaee, 2010, Reverse logistics network design using simulated annealing, International Journal of Advanced Manufacturing Technology, 47, 269, 10.1007/s00170-009-2194-5 Lee, 2007, A heuristic approach to logistics network design for end-of-lease computer products recovery, Transportation Research Part E, 44, 455, 10.1016/j.tre.2006.11.003 Wojanowski, 2007, Retail–collection network design under deposit–refund, Computers and Operations Research, 34, 324, 10.1016/j.cor.2005.03.003 Pishvaee, 2010, A memetic algorithm for bi-objective integrated forward/reverse logistics network design, Computers and Operation Research, 37, 1100, 10.1016/j.cor.2009.09.018 El-Sayed, 2010, A stochastic model for forward–reverse logistics network design under risk, Computers & Industrial Engineering, 58, 423, 10.1016/j.cie.2008.09.040 Klibi, 2010, The design of robust value-creating supply chain networks: a critical review, European Journal of Operational Research, 203, 283, 10.1016/j.ejor.2009.06.011 Ho, 1989, Evaluating the impact of operating environments on MRP system nervousness, International Journal of Production Research, 27, 1115, 10.1080/00207548908942611 Listes, 2005, A stochastic approach to a case study for product recovery network design, European Journal of Operational Research, 160, 268, 10.1016/j.ejor.2001.12.001 Salema, 2007, An optimization model for the design of a capacitated multi-product reverse logistics network with uncertainty, European Journal of Operational Research, 179, 1063, 10.1016/j.ejor.2005.05.032 Zadeh, 1978, Fuzzy sets as a basis for a theory of possibility, Fuzzy Sets and Systems, 1, 3, 10.1016/0165-0114(78)90029-5 Dubois, 2003, Fuzzy scheduling: modelling flexible constraints vs. coping with incomplete knowledge, European Journal of Operational Research, 147, 231, 10.1016/S0377-2217(02)00558-1 Selim, 2008, A supply chain distribution network design model: an interactive fuzzy goal programming-based solution approach, International Journal of Advanced Manufacturing Technology, 36, 401, 10.1007/s00170-006-0842-6 Wang, 2007, A possibilistic decision model for new product supply chain design, European Journal of Operational Research, 177, 1044, 10.1016/j.ejor.2005.12.032 Selim, 2008, Collaborative production–distribution planning in supply chain: a fuzzy goal programming approach, Transportation Research Part E, 44, 396, 10.1016/j.tre.2006.11.001 Torabi, 2008, An interactive possibilistic programming approach for multiple objective supply chain master planning, Fuzzy Sets and Systems, 159, 193, 10.1016/j.fss.2007.08.010 Shen, 2007, Integrated supply chain design models: a survey and future research directions, Journal of Industrial and Management Optimization, 3, 1, 10.3934/jimo.2007.3.1 Bellman, 1970, Decision making in a fuzzy environment, Management Science, 17, 141, 10.1287/mnsc.17.4.B141 Lai, 1992, A new approach to some possibilistic linear programming problems, Fuzzy Sets and Systems, 49, 121, 10.1016/0165-0114(92)90318-X Lai, 1993, Possibilistic linear programming for managing interest rate risk, Fuzzy Sets and Systems, 54, 135, 10.1016/0165-0114(93)90271-I Mula, 2006, MRP with flexible constraints: a fuzzy mathematical programming approach, Fuzzy Sets and Systems, 157, 74, 10.1016/j.fss.2005.05.045 Peidro, 2009, Fuzzy optimization for supply chain planning under supply, demand and process uncertainties, Fuzzy Sets and Systems, 160, 2640, 10.1016/j.fss.2009.02.021 Peidro, 2010, A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment, European Journal of Operational Research, 205, 65, 10.1016/j.ejor.2009.11.031 Jimenez, 1996, Ranking fuzzy numbers through the comparison of its expected intervals, International Journal of Uncertainty, Fuzziness and Knowledge Based Systems, 4, 379, 10.1142/S0218488596000226 Jimenez, 2007, Linear programming with fuzzy parameters: an interactive method resolution, European Journal of Operational Research, 177, 1599, 10.1016/j.ejor.2005.10.002 Wang, 2005, Applying possibilistic linear programming to aggregate production planning, International Journal of Production Economics, 98, 328, 10.1016/j.ijpe.2004.09.011 Inuiguchi, 2000, Possibilistic linear programming: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem, Fuzzy Sets and Systems, 111, 3, 10.1016/S0165-0114(98)00449-7 Parra, 2005, Solving a multiobjective possibilistic problem through compromise programming, European Journal of Operational Research, 164, 748, 10.1016/j.ejor.2003.11.028 Yager, 1981, A procedure for ordering fuzzy subsets of the unit interval, Information Sciences, 24, 143, 10.1016/0020-0255(81)90017-7 Dubois, 1987, The mean value of a fuzzy number, Fuzzy Sets and Systems, 24, 279, 10.1016/0165-0114(87)90028-5 Heilpern, 1992, The expected value of a fuzzy number, Fuzzy Sets and Systems, 47, 81, 10.1016/0165-0114(92)90062-9 Gonzalez, 1990, A study of the ranking function approach through mean values, Fuzzy Sets and Systems, 35, 29, 10.1016/0165-0114(90)90016-Y Fortemps, 1996, Ranking and defuzzification methods based on area compensation, Fuzzy Sets and Systems, 82, 319, 10.1016/0165-0114(95)00273-1 Dubois, 2000, Fuzzy interval analysis, 483, 10.1007/978-1-4615-4429-6_11 Zimmermann, 1978, Fuzzy programming and linear programming with several objective functions, Fuzzy Sets and Systems, 1, 45, 10.1016/0165-0114(78)90031-3 Sakawa, 1987, An interactive fuzzy satisfying method for multiobjective linear-programming problems and its application, IEEE Transactions on Systems, Man and Cybernetics, SMC-17, 654, 10.1109/TSMC.1987.289356 Werners, 1988, Aggregation models in mathematical programming, 295