Automated construction by contour crafting—related robotics and information technologies

Automation in Construction - Tập 13 - Trang 5-19 - 2004
Behrokh Khoshnevis1
1D.J. Epstein Department of Industrial & Systems Engineering, University of Southern California, Los Angels, CA 90089-0193, USA

Tài liệu tham khảo

Warszawski, 1998, Implementation of robotics in buildings: current status and future prospects, Journal of Construction Engineering and Management, 124, 31, 10.1061/(ASCE)0733-9364(1998)124:1(31) Balaguer, 2002, Future home: an integrated construction automation approach, IEEE Robotics and Automation, 55, 10.1109/100.993155 Pegna, 1997, Explorary investigation of solid freeform construction, Automation in construction, 5, 427, 10.1016/S0926-5805(96)00166-5 Khalili, 2000 Khoshnevis, 1998, Innovative rapid prototyping process makes large sized, smooth surfaced complex shapes in a wide variety of materials, Materials Technology, 13, 52, 10.1080/10667857.1998.11752766 Khoshnevis, 2001, Contour crafting—a layered fabrication technique, Special Issue of IEEE Robotics and Automation Magazine, 8, 33, 10.1109/100.956812 Khoshnevis, 2001, Experimental investigation of contour crafting using ceramics materials, Rapid Prototyping Journal, 7, 32, 10.1108/13552540110365144 Khoshnevis, 2002, Automated construction using contour crafting—applications on earth and beyond, vol. 989, 489 Kwon, 2002, Effect of orifice geometry on surface quality in contour crafting, Rapid Prototyping Journal, 8, 147, 10.1108/13552540210430988 H.Kown, Experimentation and Analysis of Contour Crafting Process using Ceramic Materials, Unpublished PhD dissertation, University of Southern California,2002 (may be downloaded at: http://www-rcf.usc.edu/~khoshnev/RP/RP-Top-Page.htm). Zak, 1999, Layered-manufacturing of fiber-reinforced composites, Journal of Manufacturing Science and Engineering, ASME, 121, 448, 10.1115/1.2832702 Shrunk, 1999 City of Austin Green Building Program (2002) http://www.ci.austin.tx.us/greenbuilder/. Lenssen, 1995