Fuzzy chance constrained linear programming model for optimizing the scrap charge in steel production

European Journal of Operational Research - Tập 186 - Trang 953-964 - 2008
Aiying Rong1, Risto Lahdelma2
1Technical University of Denmark, Department of Manufacturing Engineering and Management, Building 425, 2800 Kgs, Lyngby (Copenhagen), Denmark
2University of Turku, Department of Information Technology, Joukahaisenkatu 3-5, FIN-20520 Turku, Finland

Tài liệu tham khảo

AFS, 1986. Least cost charge. American Foundrymen’s Society Transactions. Banks, 1984 Bliss, 1997, Advances in scrap charge optimization, American Foundrymen’s Society Transactions, 105, 27 Canz, T., 1996. Fuzzy linear programming in DSS for energy system planning. Working paper WP-96-132, International Institute for Applied System Analysis, Austria. Dubois, 1980, Systems of linear fuzzy constraints, Fuzzy Sets and Systems, 3, 37, 10.1016/0165-0114(80)90004-4 Dubois, 1983, Ranking of fuzzy numbers in the setting of possibility theory, Information Sciences, 30, 183, 10.1016/0020-0255(83)90025-7 EUROFER (European Confederation of Iron and Steel Industries), 2001. Annual report. http://www.eurofer.org/publications/pdf/2001-AnnualReport.pdf. Ikäheimo, J., 1999. Adaptive raw material optimization system for a steel plant. Masters’s thesis. Helsinki University of Technology, Systems Analysis Laboratory, Espoo, Finland. Jiménez, 2007, Linear programming with fuzzy parameters: An interactive method, European Journal of Operational Research, 177, 1599, 10.1016/j.ejor.2005.10.002 Kall, 1994 Kim, 1987, A large scale linear programming application to least cost charging for foundry melting operations, American Foundrymen’s Society Transactions, 735 Kürsad, 2007, A chance-constrained approach to stochastic line balancing problem, European Journal of Operational Research, 180, 1098, 10.1016/j.ejor.2006.04.042 Lahdelma, R., 1998. AMRO – adaptive metallurgical raw material optimization. Technology Programme SULA 2 Energy in Steel and Base Metal Production, Final Report, TEKES, Helsinki, pp. 195–202. Lahdelma, R., Hakonen, H., Ikäheimo, J., 1999. AMRO – adaptive metallurgical raw material optimization, IFORS’99, Beijing, China 16–20 August, 1999. Liu, 1998, Chance constrained programming with fuzzy parameters, Fuzzy Sets and Systems, 94, 227, 10.1016/S0165-0114(96)00236-9 Rautaruukki, 2001. Steel for future. Sustainability report 2000–2001. http://www.bl.uk/pdf/eis/rautaruukki2001is.pdf. Sandberg, E., 2005. Energy and scrap optimization of electric arc furnace by statistical analysis of process data. Licentiate thesis, Division of Process Metallurgy, Luleå University of Technology, Sweden. Slowinski, 1986, A multi-criteria fuzzy linear programming method for water supply system development planning, Fuzzy Sets and Systems, 19, 217, 10.1016/0165-0114(86)90052-7 Taha, 1992 Turunen, J., 2000. Raw material optimization for copper foundry. Masters’s thesis. Helsinki University of Technology, Systems Analysis Laboratory, Espoo, Finland (In Finnish). Wang, 2002, The single machine ready time scheduling problem with fuzzy processing times, Fuzzy Sets and Systems, 127, 117, 10.1016/S0165-0114(01)00084-7 Watanabe, 1994, A joint chance constrained programming model with row dependence, European Journal of Operational Research, 77, 325, 10.1016/0377-2217(94)90376-X Werners, 1987, Interactive multiple objective programming subject to flexible constraints, European Journal of Operational Research, 31, 342, 10.1016/0377-2217(87)90043-9 Wilson, E., Kan, M., Mirle, A., 2001. Intelligent technologies for electric arc furnace optimization. ISS Technical paper. Zadeh, 1978, Fuzzy sets a basis for a theory of possibility, Fuzzy Sets and Systems, 1, 3, 10.1016/0165-0114(78)90029-5 Zimmermann, 1978, Fuzzy programming and linear programming with several objective functions, Fuzzy Sets and Systems, 1, 45, 10.1016/0165-0114(78)90031-3