Using multi-objective genetic algorithm for partner selection in green supply chain problems
Tài liệu tham khảo
Altiparmak, 2006, A genetic algorithm approach for multi-objective optimization of supply chain networks, Computers and Industrial Engineering, 51, 197, 10.1016/j.cie.2006.07.011
Chan, 2004, A multi-criterion genetic algorithm for order distribution in a demand driven supply chain, International Journal of Computer Integrated Manufacturing, 17, 339, 10.1080/09511920310001617022
Chan, 2005, A hybrid genetic algorithm for production and distribution, Omega, 33, 345, 10.1016/j.omega.2004.05.004
Chung, 2003, An optimal production run time with imperfect production process and allowable shortages, Computers and Operations Research, 30, 483, 10.1016/S0305-0548(01)00091-0
Coello, 2002
Coello, 2001
Deans, 1999, An approach to the environmental management of purchasing in the utilities sector, Eco-Manage, 6, 11
Deb, 2001
Erol, 2004, A methodology to support decision making across the supply chain of an industrial distributor, International Journal of Production Economics, 89, 119, 10.1016/j.ijpe.2003.10.008
Farahani, 2008, A genetic algorithm to optimize the total cost and service level for just-in-time distribution in a supply chain, International Journal of Production Economics, 111, 229, 10.1016/j.ijpe.2006.11.028
Gen, 2000
Hammond, 2007, Closed-loop supply chain network equilibrium under legislation, European Journal of Operation Research, 183, 895, 10.1016/j.ejor.2006.10.033
Handfield, 2002, Applying environmental criteria to supplier assessment: A study in the application of the Analytical Hierarchy Process, European Journal of Operational Research, 141, 70, 10.1016/S0377-2217(01)00261-2
Humphreys, 2003, Integrating environmental criteria into the supplier selection process, Journal of Materials Processing Technology, 138, 349, 10.1016/S0924-0136(03)00097-9
Kainuma, 2006, A multiple attribute utility theory approach to lean and green supply chain management, International Journal of Production Economics, 101, 99, 10.1016/j.ijpe.2005.05.010
Klein, 1966, Markovian decision models for reject allowance problems, Management Science, 12, 349, 10.1287/mnsc.12.5.349
Lee, 1986, Economic production cycles with imperfect production processes, IIE Transactions, 18, 48, 10.1080/07408178608975329
Lee, 1988, Production control in multistage systems with variable yield losses, Operations Research, 36, 269, 10.1287/opre.36.2.269
Levitan, 1960, The optimum reject allowance problem, Management Science, 6, 172, 10.1287/mnsc.6.2.172
Liu, 1996, Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operation Researches, 91, 517, 10.1016/0377-2217(94)00339-4
Murata, 1996, Multi-objective genetic algorithm and its applications to flowshop scheduling, Computers and Industrial Engineering, 30, 957, 10.1016/0360-8352(96)00045-9
New, 1984, MRP with high uncertain yield losses, Journal of Operations Management, 4, 315, 10.1016/0272-6963(84)90019-6
Noci, 1997, Designing ‘green’ vendor rating systems for the assessment of a supplier’s environmental performance, European Journal of Purchasing & Supply Management, 3, 103, 10.1016/S0969-7012(96)00021-4
Porteus, 1986, Optimal lot sizing, process quality improvement, and setup cost reduction, Operations Research, 34, 137, 10.1287/opre.34.1.137
Queiruga, 2008, Evaluation of sites for the location of WEEE recycling plans in Spain, Waste Management, 28, 181, 10.1016/j.wasman.2006.11.001
Rose, M. (2000). Design for environment: A method for formulating product end-of-life strategies, Department of Mechanical Engineering, Stanford University. (pp. 19–144).
Rose, C., Beiter, K., & Ishii, K. (1999). Determining of end-of-life strategies as a part of product definition. In Proceedings of the IEEE international symposium for electronics and the environment (pp. 219–224).
Sarkis, 2003, A strategic decision framework for green supply chain management, Journal of Cleaner Production, 11, 397, 10.1016/S0959-6526(02)00062-8
Vachon, 2006, Green project partnership in the supply chain: The case of the package printing industry, Journal of Cleaner Production, 14, 661, 10.1016/j.jclepro.2005.07.014
Wang, H. S., Che, Z. H., & Sha, D. Y. (2004). Two-stage model for flow-shop production planning with different machines, In Proceedings of the ninth annual international conference on industrial engineering – Theory, applications and practice, The University of Auckland, Auckland, New Zealand (pp. 299–304).
White, 1967, Bayes Markovian decision models for a multi-period reject allowance problem, Operations Research, 15, 857, 10.1287/opre.15.5.857
Willems, 2006, Can large-scale disassembly be profitable? A linear programming approach to quantifying the turning point to make disassembly economically viable, International Journal of Production Research, 44, 1125, 10.1080/00207540500354168