A study of labor assignment flexibility in cellular manufacturing systems
Tài liệu tham khảo
Askin, 1993, A comparison of scheduling philosophies for manufacturing cells, European Journal of Production Research, 69, 438, 10.1016/0377-2217(93)90027-K
Cesaní, V. I. (1998). An investigation of labor flexibility in cellular manufacturing systems. Ph.D. thesis. Madison, WI: University of Wisconsin.
Cesaní, V. I., & Steudel, H. J. (2000). A model to quantitatively describe labor assignment flexibility in labor limited cellular manufacturing systems. In: Proceedings of the 2000 GT/CM World Symposium (pp. 159–164). San Juan, Puerto Rico.
Fryer, 1974, Labor flexibility in multiechelon dual constrained job shops, Journal of Management Science, 20, 1073, 10.1287/mnsc.20.7.1073
Johnson, 1996, On the relative performance of functional and cellular layouts—an analysis of the model-based comparative studies literature, Production and Operations Management, 5, 309, 10.1111/j.1937-5956.1996.tb00403.x
Molleman, 1999, Functional flexibility and team performance, International Journal of Production Research, 37, 1837, 10.1080/002075499191021
Morris, 1994, A simulation comparison of process and cellular layouts in dual resource constrained environments, Computers and Industrial Engineering, 26, 733, 10.1016/0360-8352(94)90008-6
Nelson, 1967, Labor and machine limited production systems, Management Science, 13, 648, 10.1287/mnsc.13.9.648
Nelson, 1970, A simulation of labor efficiency and central assignments in a production model, Management Science, 17, 97, 10.1287/mnsc.17.2.B97
Ostolaza, 1999, The use of dynamic (state-dependent) assembly-line balancing to improve throughput, Journal of Manufacturing Operations Management, 3, 105
Park, 1989, Job release and labor flexibility in a dual resource constrained job shop, Journal of Operations Management, 8, 230, 10.1016/0272-6963(89)90026-0
Russell, 1991, A study of labor allocation strategies in cellular manufacturing, Decision Sciences, 22, 594, 10.1111/j.1540-5915.1991.tb01283.x
Shafer, 1995, A simulation analyses of factors influencing loading practices in cellular manufacturing,”, International Journal of Production Research, 33, 279, 10.1080/00207549508930148
Suresh, 1994, Coping with the loss of pooling synergy in cellular manufacturing systems, Management Science, 40, 466, 10.1287/mnsc.40.4.466
S-plus User's Manual, Version 4.0 (1997), MathSoft, Inc., Seattle, Washington.
Trevelen, 1989, A review of the dual resource constraint system research, IIE Transactions, 21, 279, 10.1080/07408178908966233
User's guide to Starcell: a simulator for manufacturing work cells (1991), H. J. Steudel and Associates, Inc.
Van Oyen, M. P., Gel, E. G. S., & Hoop, W. J. (2000). Performance opportunity for workforce agility in collaborative and non-collaborative work system, IIE Transactions, 33(9), 761–777.
Wirth, 1993, An investigation of scheduling policies in a dual-constrained manufacturing cell, Decision Sciences, 24, 761, 10.1111/j.1540-5915.1993.tb00488.x