BIM for infrastructure: An overall review and constructor perspective

Automation in Construction - Tập 71 - Trang 139-152 - 2016
Alex Bradley1, Haijiang Li1, Robert Lark1, Simon Dunn1
1School of Engineering, Cardiff University, Queens Building, the Parade, Cardiff CF24 3AA, UK

Tài liệu tham khảo

Ajam, 2010, Augmented process model for e-tendering: Towards integrating object models with document management systems, Autom. Constr., 19, 762, 10.1016/j.autcon.2010.04.001 Al-Mashta, 2010, Integrated cost budgeting and estimating model for building projects, 22 Aram, 2014, A knowledge-based framework for quantity takeoff and cost estimation in the AEC industry using BIM, 434, 10.22260/ISARC2014/0058 Babič, 2010, Integrating resource production and construction using BIM, Autom. Constr., 19, 539, 10.1016/j.autcon.2009.11.005 Borrmann, 2010, From GIS to BIM and back again - A Spatial Query Language for 3D building models and 3D city models, 19 Borrmann, 2014, Multi-scale geometric-semantic modeling of shield tunnels for GIS and BIM applications, Comput. Aided Civ. Infrastruct. Eng. Braun, 2015, Towards automated construction progress monitoring using BIM-based point cloud processing, 101 Building and Construction Authority, 2013 Building Smart Finland, 2012 Building SMART International User Group, 2012 Cabinet Office, 2012 Cao, 2014, Study on cost decision model based on BIM and AHP, Vol. 584-586, 2205 Chen, 2011, Using bim model and genetic algorithms to optimize the crew assignment for construction project planning, Int. J. Technol., 2, 179 Cheng, 2016, Analytical review and evaluation of civil information modeling, Autom. Constr., 67, 31, 10.1016/j.autcon.2016.02.006 Lin, 2008, Modelling predictive construction durations for building project in Taiwan Cho, 2011, Introduction of construction management integrated system using BIM in the Honam high-speed railway lot no. 4-2, 1300 Computer Integrated Construction Research Program, 2011 Cooke, 2008, ToolSHeDTM: The development and evaluation of a decision support tool for health and safety in construction design, Eng. Constr. Archit. Manag., 15, 336, 10.1108/09699980810886847 El-Omari, 2011, Integrating automated data acquisition technologies for progress reporting of construction projects, Autom. Constr., 20, 699, 10.1016/j.autcon.2010.12.001 Faghihi, 2014, Construction scheduling using Genetic Algorithm based on Building Information Model, Expert Syst. Appl., 41, 7565, 10.1016/j.eswa.2014.05.047 Fu, 2003, IFC implementation in lifecycle costing, 14 Gelisen, 2014, Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis, J. Constr. Eng. Manag., 140, 10.1061/(ASCE)CO.1943-7862.0000674 Geun-Ha, 2013, The Extension of IFC Model Schema for Geometry Part of Road Drainage Facility, J. Korea Acad. Ind. Cooper. Soc., 14, 5987 Gökçe, 2006, IT supported construction project management based on IFC and ISO9001:2000, 513 Golparvar-Fard, 2010, Automated model-based recognition of progress using daily construction photographs and IFC-based 4D models, 51, 10.1061/41109(373)6 Hajian, 2009, A research outlook for real-time project information management by integrating advanced field data acquisition systems and building information modeling, 83, 10.1061/41052(346)9 Han, 2013, Construction monitoring of civil structures using high resolution remote sensing images, 595 Heikkilä, 2013, Integration of BIM and automation in high-rise building construction, 1171 HM Government, 2008 Hong, 2012, A study on the correlation analysis for connection between IFC and CityGML, 9, 10.1145/2442616.2442619 Hong Kong Construction Industry Council, 2015 Howard, 2008, Building information modelling – Experts’ views on standardisation and industry deployment, Adv. Eng. Inform., 22, 271, 10.1016/j.aei.2007.03.001 Hu, 2011, BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials, Autom. Constr., 20, 167, 10.1016/j.autcon.2010.09.014 Hu, 2011, BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies, Autom. Constr., 20, 155, 10.1016/j.autcon.2010.09.014 International Organization for Standardization (ISO), 2013 Jung, 2011, Building information modelling (BIM) framework for practical implementation, Autom. Constr., 20, 126, 10.1016/j.autcon.2010.09.010 Karshenas, 2013, Ontology-based building information modeling, 476 Kim, 2014, Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling, J. Constr. Eng. Manag., 140, 10.1061/(ASCE)CO.1943-7862.0000898 Lawrence, 2014, Creating flexible mappings between Building Information Models and cost information, Autom. Constr., 45, 107, 10.1016/j.autcon.2014.05.006 Liao, 2014, Improving construction schedule and cost information feedback in building information modelling, Proc. Inst. Civ. Eng. Manag. Procur. Law, 167, 91 Liu, 2014, Using BIM to improve the design and construction of bridge projects: A case study of a long-span steel-box arch bridge project, Int. J. Adv. Robot. Syst., 11 Lorenzo, 2014, A Synergic Application in Construction Site Management, Procedia Eng., 85, 520, 10.1016/j.proeng.2014.10.579 Lu, 2011, A gene expression programming algorithm for highway construction cost prediction problems, J. Transp. Syst. Eng. Inf. Technol., 11, 85 Mäki, 2014, Site managers' uses of building information modeling on construction sites, 611 Marx, 2013, Modeling and simulating spatial requirements of construction activities, 3294 McCuen, 2011, Cost savings achieved through changing processes for cost estimating in building information modeling, 1 McGraw-Hill Construction, 2012 McGraw-Hill Construction, 2010 Melzner, 2013, Model-based construction work analysis considering process-related hazards, 3203 Mignard, 2011, Interoperability between GIS and BIM: A semantic-based multi-representation approach, 359 Moon, 2014, Development of workspace conflict visualization system using 4D object of work schedule, Adv. Eng. Inform., 28, 50, 10.1016/j.aei.2013.12.001 Moon, 2014, Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces, Autom. Constr., 39, 93, 10.1016/j.autcon.2013.06.001 National Institute of Building Sciences, 2012 NATSPEC, 2011 Nepal, 2009, Querying ifc-based building information models to support construction management functions, 506, 10.1061/41020(339)52 Press, 2016 Rezgui, 2012 Rijksgebouwendienst, 2012 Shi, 2000, Object-oriented resource-based planning method (ORPM) for construction, Int. J. Proj. Manag., 18, 179, 10.1016/S0263-7863(99)00013-7 Sibert, 2013, Using building information modelling on a highway project, Proc. Inst. Civ. Eng. Civ. Eng., 166, 9 Stacy, 2013, BIM for the Northern Hub ECS1 programme, Struct. Eng., 91, 50 Statsbygg, 2013 Su, 2013, Developing BIM-based shop drawing automated system integrated with 2D barcode in construction Sulbaran, 2009, Conceptual processes for integration of a BIM software and a cost estimating software, 175 The National Building Specification, 2015 Weldu, 2012, Automated generation of 4D building information models through spatial reasoning, 612, 10.1061/9780784412329.062 Weldu, 2013, Automating construction activity generation visualization, 241 Yabuki, 2010, Issues and Implementation Methods for Bim in the Civil Infrastructure Domain, 133 Zhiliang, 2011, Application and extension of the IFC standard in construction cost estimating for tendering in China, Autom. Constr., 20, 196, 10.1016/j.autcon.2010.09.017