BIM for infrastructure: An overall review and constructor perspective
Tài liệu tham khảo
Ajam, 2010, Augmented process model for e-tendering: Towards integrating object models with document management systems, Autom. Constr., 19, 762, 10.1016/j.autcon.2010.04.001
Al-Mashta, 2010, Integrated cost budgeting and estimating model for building projects, 22
Aram, 2014, A knowledge-based framework for quantity takeoff and cost estimation in the AEC industry using BIM, 434, 10.22260/ISARC2014/0058
Babič, 2010, Integrating resource production and construction using BIM, Autom. Constr., 19, 539, 10.1016/j.autcon.2009.11.005
Borrmann, 2010, From GIS to BIM and back again - A Spatial Query Language for 3D building models and 3D city models, 19
Borrmann, 2014, Multi-scale geometric-semantic modeling of shield tunnels for GIS and BIM applications, Comput. Aided Civ. Infrastruct. Eng.
Braun, 2015, Towards automated construction progress monitoring using BIM-based point cloud processing, 101
Building and Construction Authority, 2013
Building Smart Finland, 2012
Building SMART International User Group, 2012
Cabinet Office, 2012
Cao, 2014, Study on cost decision model based on BIM and AHP, Vol. 584-586, 2205
Chen, 2011, Using bim model and genetic algorithms to optimize the crew assignment for construction project planning, Int. J. Technol., 2, 179
Cheng, 2016, Analytical review and evaluation of civil information modeling, Autom. Constr., 67, 31, 10.1016/j.autcon.2016.02.006
Lin, 2008, Modelling predictive construction durations for building project in Taiwan
Cho, 2011, Introduction of construction management integrated system using BIM in the Honam high-speed railway lot no. 4-2, 1300
Computer Integrated Construction Research Program, 2011
Cooke, 2008, ToolSHeDTM: The development and evaluation of a decision support tool for health and safety in construction design, Eng. Constr. Archit. Manag., 15, 336, 10.1108/09699980810886847
El-Omari, 2011, Integrating automated data acquisition technologies for progress reporting of construction projects, Autom. Constr., 20, 699, 10.1016/j.autcon.2010.12.001
Faghihi, 2014, Construction scheduling using Genetic Algorithm based on Building Information Model, Expert Syst. Appl., 41, 7565, 10.1016/j.eswa.2014.05.047
Fu, 2003, IFC implementation in lifecycle costing, 14
Gelisen, 2014, Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis, J. Constr. Eng. Manag., 140, 10.1061/(ASCE)CO.1943-7862.0000674
Geun-Ha, 2013, The Extension of IFC Model Schema for Geometry Part of Road Drainage Facility, J. Korea Acad. Ind. Cooper. Soc., 14, 5987
Gökçe, 2006, IT supported construction project management based on IFC and ISO9001:2000, 513
Golparvar-Fard, 2010, Automated model-based recognition of progress using daily construction photographs and IFC-based 4D models, 51, 10.1061/41109(373)6
Hajian, 2009, A research outlook for real-time project information management by integrating advanced field data acquisition systems and building information modeling, 83, 10.1061/41052(346)9
Han, 2013, Construction monitoring of civil structures using high resolution remote sensing images, 595
Heikkilä, 2013, Integration of BIM and automation in high-rise building construction, 1171
HM Government, 2008
Hong, 2012, A study on the correlation analysis for connection between IFC and CityGML, 9, 10.1145/2442616.2442619
Hong Kong Construction Industry Council, 2015
Howard, 2008, Building information modelling – Experts’ views on standardisation and industry deployment, Adv. Eng. Inform., 22, 271, 10.1016/j.aei.2007.03.001
Hu, 2011, BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials, Autom. Constr., 20, 167, 10.1016/j.autcon.2010.09.014
Hu, 2011, BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies, Autom. Constr., 20, 155, 10.1016/j.autcon.2010.09.014
International Organization for Standardization (ISO), 2013
Jung, 2011, Building information modelling (BIM) framework for practical implementation, Autom. Constr., 20, 126, 10.1016/j.autcon.2010.09.010
Karshenas, 2013, Ontology-based building information modeling, 476
Kim, 2014, Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling, J. Constr. Eng. Manag., 140, 10.1061/(ASCE)CO.1943-7862.0000898
Lawrence, 2014, Creating flexible mappings between Building Information Models and cost information, Autom. Constr., 45, 107, 10.1016/j.autcon.2014.05.006
Liao, 2014, Improving construction schedule and cost information feedback in building information modelling, Proc. Inst. Civ. Eng. Manag. Procur. Law, 167, 91
Liu, 2014, Using BIM to improve the design and construction of bridge projects: A case study of a long-span steel-box arch bridge project, Int. J. Adv. Robot. Syst., 11
Lorenzo, 2014, A Synergic Application in Construction Site Management, Procedia Eng., 85, 520, 10.1016/j.proeng.2014.10.579
Lu, 2011, A gene expression programming algorithm for highway construction cost prediction problems, J. Transp. Syst. Eng. Inf. Technol., 11, 85
Mäki, 2014, Site managers' uses of building information modeling on construction sites, 611
Marx, 2013, Modeling and simulating spatial requirements of construction activities, 3294
McCuen, 2011, Cost savings achieved through changing processes for cost estimating in building information modeling, 1
McGraw-Hill Construction, 2012
McGraw-Hill Construction, 2010
Melzner, 2013, Model-based construction work analysis considering process-related hazards, 3203
Mignard, 2011, Interoperability between GIS and BIM: A semantic-based multi-representation approach, 359
Moon, 2014, Development of workspace conflict visualization system using 4D object of work schedule, Adv. Eng. Inform., 28, 50, 10.1016/j.aei.2013.12.001
Moon, 2014, Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces, Autom. Constr., 39, 93, 10.1016/j.autcon.2013.06.001
National Institute of Building Sciences, 2012
NATSPEC, 2011
Nepal, 2009, Querying ifc-based building information models to support construction management functions, 506, 10.1061/41020(339)52
Press, 2016
Rezgui, 2012
Rijksgebouwendienst, 2012
Shi, 2000, Object-oriented resource-based planning method (ORPM) for construction, Int. J. Proj. Manag., 18, 179, 10.1016/S0263-7863(99)00013-7
Sibert, 2013, Using building information modelling on a highway project, Proc. Inst. Civ. Eng. Civ. Eng., 166, 9
Stacy, 2013, BIM for the Northern Hub ECS1 programme, Struct. Eng., 91, 50
Statsbygg, 2013
Su, 2013, Developing BIM-based shop drawing automated system integrated with 2D barcode in construction
Sulbaran, 2009, Conceptual processes for integration of a BIM software and a cost estimating software, 175
The National Building Specification, 2015
Weldu, 2012, Automated generation of 4D building information models through spatial reasoning, 612, 10.1061/9780784412329.062
Weldu, 2013, Automating construction activity generation visualization, 241
Yabuki, 2010, Issues and Implementation Methods for Bim in the Civil Infrastructure Domain, 133
Zhiliang, 2011, Application and extension of the IFC standard in construction cost estimating for tendering in China, Autom. Constr., 20, 196, 10.1016/j.autcon.2010.09.017
