A semi-quantitative assessment of occupational risks using bow-tie representation

Safety Science - Tập 48 - Trang 973-979 - 2010
Celeste Jacinto1,2, Cristina Silva3
1Department of Mechanical and Industrial Engineering, Faculty of Science and Technology, Universidade Nova de, Lisboa, Campus de Caparica, 2829-516 Caparica, Portugal
2Safety, Reliability and Maintenance Group of CENTEC, Technical University of Lisbon, Instituto Superior Técnico, Av. Rovisco Pais, 1049-001 Lisboa, Portugal
3Arsenal do Alfeite, Alfeite, 2810-001 Almada, Portugal

Tài liệu tham khảo

Aneziris, 2008, Quantified risk assessment for fall from height, Safety Science, 46, 198, 10.1016/j.ssci.2007.06.034 Arsenal do Alfeite, 2003. Arsenal Safety Book – Safe Work, 2003 ed. Alfeite (in Portuguese). Bellamy, 2008, The software tool Storybuilder and the analysis of the horrible stories of occupational accidents, Safety Science, 46, 186, 10.1016/j.ssci.2007.06.022 BSI-BS 8800, 2004. Guide to Occupational Health and Safety Management Systems. British Standard Institutions, UK. Delvosalle, 2003, ARAMIS project: identification of reference accident scenarios in SEVESO establishments, Safety and Reliability, 2003, 479 Delvosalle, 2006, ARAMIS project: a comprehensive methodology for the identification of reference accident scenarios in process industries, Journal of Hazardous Materials, 130, 200, 10.1016/j.jhazmat.2005.07.005 Dianous, 2006, ARAMIS project: a more explicit demonstration of risk control through the use of bow-tie diagrams and the evaluation of safety barrier performance, Journal of Hazardous Materials, 130, 220, 10.1016/j.jhazmat.2005.07.010 Eurostat, 2001. European Statistics on Accidents at Work (ESAW) – Methodology, 2001 ed. DG Employment and Social Affairs. European Commission, Luxembourg. Goossens, 2008, Quantifying occupational risk: the development of an occupational risk model, Safety Science, 46, 176, 10.1016/j.ssci.2007.02.001 Hale, 2001, Conditions of occurrence of major and minor accidents, Institution of Occupational Safety and Health, IOSH Journal, 5, 7 Hale, A., Ale, B., Bellamy, L., Whiston, J., Mud, M., Papazoglou, I., Bloemhof, B., Post, J., Oh, J., 2005. Best practice in risk assessment: work accidents. In: European Consumer Safety Association Conference, Edinburgh, 20–21 April, 2005. Harms-Ringdahl, 2001 Kurowicka, D., Cooke, R., Goossens, L., Ale, B., 2006. Expert judgment study for placement ladder bow-tie. In: Guedes Soares, Zio (Eds.), Safety and Reliability for Managing Risk, vol. 1. ESREL 2006. Balkema, Taylor & Francis Group, London, pp. 21–27. Papazoglou, 2007, A logical model for the quantification of occupational risk, Reliability Engineering and System Safety, 92, 785, 10.1016/j.ress.2006.04.017 Salvi, 2006, A global view on ARAMIS, a risk assessment methodology for industries in the framework of the SEVESO II directive, Journal of Hazardous Materials, 130, 187, 10.1016/j.jhazmat.2005.07.034 Trbojevic, V.M., 2001. Linking Risk Assessment of Marine Operations to Safety Management. In: Proceedings of the 6th Biennial Marine Transportation System Research and Technology Coordination Conference, Washington DC, 14–16 November, 2001. Zuijderduijn, C., 1999. Risk management at Shell Pernis refinery/chemicals – implementation of SEVESO-II based on build up experiences, using a hazards and effects management process. In: Proceedings of the Seveso 2000 European Conference, Athens, Greece, 10–12 November, 1999.