Performance prediction of hard rock Tunnel Boring Machines (TBMs) in difficult ground
Tóm tắt
Từ khóa
Tài liệu tham khảo
Abd Al-Jalil, 1998
Alvarez Grima, 2000, Modeling tunnel boring machine performance by neuro-fuzzy methods, Tunnell. Undergr. Space Technol., 15, 259, 10.1016/S0886-7798(00)00055-9
Barton, 2000
Barton, N., 2011. TBM prognosis for open-gripper and double-shield machines tunneling through hard jointed rock with weakness zones. In: Proceedings of World Tunneling Congress (WTC), May 20–26, Helsinki, Finland.
Bieniawski, Z.T., Celada, B., Galera, J.M., Álvares, M., 2006. Rock mass excavability (RME) index: a new way to selecting the optimum tunnel construction method. In: Proc. ITA World Tunneling Congress, Seoul.
Bieniawski, Z.T., Celada, B., Galera, J.M., 2007. TBM excavability: prediction and machine–rock interaction. In: Proceedings of the Rapid Excavation and Tunneling Conference (RETC), Toronto, Canada, pp. 1118–1130.
Bieniawski, Z.T., Celada, B., Galera, J.M., Tardáguila, I., 2008. New applications of the excavability index for selection of TBM types and predicting their performance. In: ITA World Tunneling Congress, Agra, India.
Blindheim, O.T., 1979. Boreability Predictions for Tunneling. Ph.D. Thesis. Department of Geological Engineering, The Norwegian Institute of Technology, pp. 406.
Bruland, A., 1998. Hard Rock Tunnel Boring. Doctoral Thesis. Norwegian University of Science and Technology (NTNU), Trondheim, Norway.
Duhme, R., Rahm, T., Scheffer, M., König, M., Thewes, M., 2014. Process simulation as a tool for TBM jobsite logistics planning. In: Proceedings of the Eighth International Symposium on Geotechnical Aspects of Underground Construction in Soft Ground, IS-Seoul 2014, August 25–27, 2014.
Einstein, 1992
Einstein, 2001, The decision aids for tunnelling (DAT) – a brief review, Tunnell. Technol. Kor. Tunnell. Assoc., 3, 37
EFNARC, 2005. Specification and Guidelines for the use of Specialist Products for Mechanized Tunnelling (TBM) in Soft Ground and Hard Rock. <http://www.efnarc.org/pdf/TBMGuidelinesApril05.pdf>.
Farrokh, E., 2012. Study of Utilization Factor and Advance Rate of Hard Rock TBMs. PhD Thesis Dissertation. Department of Energy and Minerals Engineering, The Pennsylvania State University.
Gong, Q.M., 2006. Development of a Rock Mass Characteristics Model for TBM Penetration Rate Prediction. PhD Thesis. School of Civil and Environmental Engineering, Nanyang Technical University.
Hassanpour, 2009, Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel, Geomech. Geoeng.: Int. J., 4, 287, 10.1080/17486020903174303
ITA-AITES, 2000. Recommendations and Guidelines for Tunnel Boring Machines (TBMs). ITA WG-14 Mechanized Tunnelling. <http://www.ita-aites.org/media/k2/attachments/public/Recommendations_ITA_TBM.pdf>.
ITA-AITES, 2009. Qualification Requirements for Enlistment in Challenging Project List. ITA WG-14 Mechanized Tunnelling. <http://www.ita-aites.org/>.
Laughton, C., 1998. Evaluation and Prediction of Tunnel Boring Machine Performance in Variable Rock Masses. Ph.D. Thesis. The University of Texas, Austin, USA.
Ozdemir, L., 1977. Development of Theoretical Equations for Predicting Tunnel Boreability. Ph.D. Thesis. T-1969. Colorado school of mines, Golden Co.
Nelson, P., O’Rourke, T.D., 1983. Tunnel Boring Machine Performance in Sedimentary Rocks. Report to Goldberg-Zoino Associates of New York, P.C., by School of Civil and Environmental of Civil Engineering. Cornell University. Geotechnical Engineering Report 83-3. Ithaca. New York, pp. 438.
Nelson, P.P., Abad-Aljali, Y., Laughton, C., 1999. Improved strategies for TBM performance prediction and project management. In: RETC, pp. 963–979.
Rostami, J., 1991. Design Optimization, Performance Predictions, and Economic Analysis of TBM Application in the Proposed Yucca Mountain Nuclear Waste Repository. Thesis #4139. Colorado School of Mines, 1991.
Rostami, J., 1997. Development of a Force Estimation Model for Rock Fragmentation with Disc Cutters Through Theoretical Modeling and Physical Measurement of Crushed Zone Pressure. PhD. Thesis Dissertation. Department of Mining Engineering, Colorado School of Mines, T-5008.
Rostami, J., Khademi Hamidi, J., Bayati, M., 2010. Review of TBM utilization and impact of difficult ground conditions in Zagros water conveyance tunnel. In: World Tunneling Conference and 36th general assembly of ITA, May 10–14, Vancouver, Canada.
Rostami, 2014, “Advance rate simulation for hard rock TBMs”, Korean Society of Civil Engineering. Special edition on tunnelling and underground space construction for sustainable development, KSCE J. Civ. Eng., 18, 837, 10.1007/s12205-014-0058-5
Sharp, 1991, Computer modelling for TBM performance prediction and optimization, vol. 1(4), 57
Yagiz, S., 2002. Development of Rock Fracture and Brittleness Indices to Quantify the Effects of Rock Mass Features and Toughness in the CSM Model Basic Penetration for Hard Rock Tunneling Machines. PhD Thesis. Dept of Mining Engineering, Colorado School of Mines, T-5605.
